Sort on Published Date;
Oldest First |
Newest First OR,
Sort on Info First Seen/Last Updated at Top
Info Database Last Updated 08.04.2024 (Entity News entries: 18)
Type/Category of Info:
General Mining News
Info Source From:
The Mining World. Volume: 29 [XXIX], Issue No. 23Info Publication Date:
December 5, 1908Info found on page:
860Info Title:
Block 8 of School Section Maintains Steady Production
Cripple Creek—A steady production of 150 to 175 tons a week is maintained from leasing block No. 8 of school section 16 on the northeast slope of Bull hill.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 05.01.2024 (13:01:09)
Above Info was First Seen 05.01.2024
Type/Category of Info:
General Mining News
Info Source From:
The Mining World. Volume: 29 [XXIX], Issue No. 13Info Publication Date:
September 26, 1908Info found on page:
495Info Title:
School Section Leasing Co. Installs Cameron Pump
Cripple Creek—A No. 7 Cameron pump has been purchased by the School Section Leasing Co., operating on block No. 8 of the Bull Hill school section. The mine is producing steadily, consignments being sent out three days in each week. The ore yields from 1 to 3 oz. gold per ton.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 01.01.2024 (11:27:26)
Above Info was First Seen 01.01.2024
Type/Category of Info:
General Mining News
Info Source From:
Mining Science. Volume: 58 [LVIII], Issue No. 13Info Publication Date:
September 24, 1908Info found on page:
257Info Title:
School Section Leasing Co. Installs Cameron Pump
A No. 7 Cameron pump is being installed by the School Section Leasing Co., operating on Bull hill. The property is producing steadily.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 01.01.2024 (11:18:40)
Above Info was First Seen 15.06.2010
Type/Category of Info:
General Mining News
Info Source From:
The Engineering and Mining Journal. Volume: 92 [XCII], Issue No. 23Info Publication Date:
December 2, 1911Info found on page:
1104Info Title:
School Section Leasing Co.'s Main Oreshoot Richer at Depth
School Section Leasing Company— The main oreshoot of the company at 500 ft. is richer than at 450 and an output of 25 cars per month of 1-oz. gold ore is being made.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 12.11.2023 (14:20:10)
Above Info was First Seen 30.03.2019
Type/Category of Info:
Special/Editorial Correspondence
Info Source From:
The Mining and Scientific Press. Volume: 94 [XCIV], Issue No. 17Info Publication Date:
April 27, 1907Info found on page:
526Info Title:
School Section Co. Mines Good Ore
Cripple Creek, Colorado.
Strike of Ore—Mining on School Lands.
Good ore is being mined from a block of the Cameron school section on Bull hill operated by the School Section Leasing Co. About four cars per week are shipped giving returns around $30 per ton. The royalties are paid to the school funds of the Cripple Creek district.
Above Info was Last Updated on 12.11.2023 (14:17:35)
Above Info was First Seen 23.05.2021
Type/Category of Info:
General Mining News
Info Source From:
Mining Reporter. Volume: 55 [LV], Issue No. 17Info Publication Date:
April 25, 1907Info found on page:
385Info Title:
School Section Co. Mines Good Ore
The School Hill Leasing Company, operating on the Bull Hill school section, is shipping weekly five cars of ore of a value of from one and one-half to three ounces gold.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 12.11.2023 (14:16:19)
Above Info was First Seen 06.06.2010
Type/Category of Info:
General Mining News
Info Source From:
The Mining World. Volume: 26 [XXVI], Issue No. 7Info Publication Date:
February 16, 1907Info found on page:
254Info Title:
School Section Leasing Co. Doing Good
Denver.—The School Section Leasing company is now making extensive improvements on the Cameron school section No. 8 in Cripple Creek district. This lease is the only one owned by the state of Colorado which has paid any revenue to the school fund. This company has taken out upwards of $500,000 and is shipping regularly.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 12.11.2023 (14:15:18)
Above Info was First Seen 12.11.2023
Type/Category of Info:
General Mining News
Info Source From:
Mining Science. Volume: 58 [LVIII], Issue No. 1505Info Publication Date:
December 3, 1908Info found on page:
457Info Title:
Block 8 of School Section Maintains Steady Production
A steady production of 150 tons a week is being maintained from the school section lease, on block No. 8, on Bull hill.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 09.04.2023 (18:01:18)
Above Info was First Seen 16.06.2010
Type/Category of Info:
General Mining News
Info Source From:
Mining Science. Volume: 59 [LIX], Issue No. 1510Info Publication Date:
January 7, 1909Info found on page:
17Info Title:
Cameron School Section No. 8 December Production
The December production from block eight of the Cameron school section amounted to 550 tons, having an approximate bullion value of $10,000.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 04.04.2023 (09:02:50)
Above Info was First Seen 16.06.2010
Type/Category of Info:
General Mining News
Info Source From:
Mining Reporter. Volume: 53 [LIII], Issue No. 17Info Publication Date:
April 26, 1906Info found on page:
422Info Title:
School Section Leasing Co. Made Important Strike
School Section Leasing Company.—An important strike was made on the Cameron School Section No. 8, which is under lease to this company. At a depth of 625 feet a three-foot vein was uncovered carrying values between three and four ounces gold.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 04.04.2023 (09:01:09)
Above Info was First Seen 04.06.2010
Type/Category of Info:
General Mining News
Info Source From:
Mining Reporter. Volume: 49 [XLIX], Issue No. 9Info Publication Date:
March 3, 1904Info found on page:
228Info Title:
Cameron School Section Block 8 Strike
La Montague Bros., who have been operating block 8 of Cameron School Section for the past five years, are reported to have made a rich strike at a depth of 450 feet at a point 200 feet from the shaft.
While working on the ore shoot, which is about four feet in width, a sixteen-inch streak of rich ore was encountered. These lessees have only recently been granted an extension of their lease, the property being owned by the state.
Notes/Text been Edited:
Abstracted and slightly rewritten from source text.Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 29.08.2022 (21:18:20)
Above Info was First Seen 29.08.2022
Type/Category of Info:
General Mining News
Info Source From:
Mining Reporter. Volume: 55 [LV], Issue No. 21Info Publication Date:
May 23, 1907Info found on page:
479Info Title:
School Section Leasing Co. Weekly Shipments
The School Section Leasing Company, operating near Cameron, is shipping about five cars of $40 ore weekly. Ore extraction is made from between the 350 and 450-ft. levels.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 16.07.2022 (08:29:53)
Above Info was First Seen 07.06.2010
Type/Category of Info:
General Mining News
Info Source From:
Mining and Scientific Press. Volume: 99 [XCIX], Issue No. 2578; 25Info Publication Date:
December 18, 1909Info found on page:
837Info Title:
School Section Leasing Co. Shipping From New Orebody
A new orebody has been opened on the third level of the school land operated by the School Section Leasing Co., and several cars of ore shipped that assayed from $18 to $24 per ton.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 30.04.2022 (22:18:11)
Above Info was First Seen 30.04.2022
Type/Category of Info:
General Mining News
Info Source From:
The Morning Times. Volume: 7 [VII], Issue No. 231Info Publication Date:
August 30, 1899Info found on page:
1Info Title:
Block 8 of School Section Completes Station at 250-Ft
On block 8, school section No. 16, Grassy Townsite vicinity, Seavey and associates, of Colorado City, have completed a station at the 250-foot point. They are now crosscutting for the vein.
Notes/Text been Edited:
Abstracted and slightly rewritten from source text.Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 10.10.2021 (18:51:24)
Above Info was First Seen 17.12.2020
Type/Category of Info:
General Mining News
Info Source From:
The Engineering and Mining Journal. Volume: 92 [XCII], Issue No. 17Info Publication Date:
October 21, 1911Info found on page:
818Info Title:
School Section September Output
School Section—The September output of this mine at the base of Bull hill, was 28 cars of mill ore.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 30.10.2020 (11:04:30)
Above Info was First Seen 27.03.2019
Type/Category of Info:
General Mining News
Info Source From:
The Mining and Scientific Press. Volume: 118 [CXVIII], Issue No. 6Info Publication Date:
February 8, 1919Info found on page:
196Info Title:
School Section Lessees in Ore
Kissell & Phelps, lessees of block 8 of school section 16, have commenced to break and hoist ore from the main shaft on the eastern slope of Bull hill.
This is the only property on school land in the district that has paid royalties to the State.
Above Info was Last Updated on 30.10.2020 (11:04:30)
Above Info was First Seen 03.03.2020
Type/Category of Info:
General Mining News
Info Source From:
The Mining and Scientific Press. Volume: 124 [CXXIV], Issue No. 9Info Publication Date:
March 4, 1922Info found on page:
311Info Title:
Block 8 of School Section 16 Active Again
Block 8 of School Section 16, on the eastern slope of Bull Cliffs, is again active. The La Montagne shaft, that has been a producer in the past, has been leased to local miners who formerly worked on the property, and will be unwatered, as it is claimed ore is exposed below the present water-level.
Above Info was Last Updated on 30.10.2020 (11:04:30)
Above Info was First Seen 12.02.2020
Type/Category of Info:
General Mining News
Info Source From:
The Engineering and Mining Journal. Volume: 88 [LXXXVIII], Issue No. 25Info Publication Date:
December 18, 1909Info found on page:
1244Info Title:
School Section Company Found Ore Body
School Section—This company, leasing on block 8, School Section No. 16, at the base of Bull hill, has opened a new ore-body at the third level. The ore is about 6 ft. wide, and can be hand-sorted to run about $20 in gold, with shipments of about 75 tons per week.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 30.10.2020 (11:04:30)
Above Info was First Seen 30.05.2019