Sort on Published Date;
Oldest First |
Newest First OR,
Sort on Info First Seen/Last Updated at Top
Info Database Last Updated 08.04.2024 (Entity News entries: 10)
Type/Category of Info:
General Mining News
Info Source From:
The Mining World. Volume: 27 [XXVII], Issue No. 9Info Publication Date:
August 31, 1907Info found on page:
364Info Title:
Elkton Con. Ships Rate of 1,200 Tons Monthly
Cripple Creek—The Elkton Con., working one shift six days a week, continues to ship at the rate of 1,200 tons monthly and the net smelting returns are about $35,000.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 01.12.2023 (08:59:05)
Above Info was First Seen 26.11.2010
Type/Category of Info:
Article
Info Source From:
Mineral Resources of the United States. Volume: 23 [XXIII]Info Publication Date:
August 1907Info found on page:
240Info Title:
Doctor Jack Pot in 1906
During 1906, large gains in production were made in the Doctor Jack Pot.
Notes/Text been Edited:
Abstracted and slightly rewritten from source text.Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 04.07.2022 (14:14:37)
Above Info was First Seen 10.05.2010
Type/Category of Info:
General Mining News
Info Source From:
The Mining World. Volume: 25 [XXV], Issue No. 26Info Publication Date:
December 29, 1906Info found on page:
787Info Title:
Elkton Shipped 24 Cars in December
Denver.—The Elkton has shipped thus far this month 24 cars of 2-ounce grade. The output for December is reckoned at $50,000.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 09.11.2023 (17:20:35)
Above Info was First Seen 09.11.2023
Type/Category of Info:
General Mining News
Info Source From:
PROFITS; A Journal of Finance and Mining Worth While. Volume: 4 [IV], Issue No. 48Info Publication Date:
February 25, 1905Info found on page:
2Info Title:
Elkton Operations on Tremendous Scale
Colorado Springs, Col., Feb. 20.—On the Elkton property operations are being carried forward on a tremendous scale, not only by the company, but by different lessees and from the different operators between 3000 and 4000 tons of ore are going out each month, which leaves a profit balance of over $25,000 to the company each thirty days.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 11.10.2023 (17:46:09)
Above Info was First Seen 11.10.2023
Type/Category of Info:
General Mining News
Info Source From:
PROFITS; A Journal of Finance and Mining Worth While. Volume: 4 [IV], Issue No. 29Info Publication Date:
October 15, 1904Info found on page:
4Info Title:
Doctor Jack Pot Lessees Doing Regular Shipments
Colorado Springs, Col., Oct. 12.—Twelve sets of lessees operating on the Doctor Jack Pot territory on Raven Hill, are sending out regular shipments of ore, and during the past month totaled in the neighborhood of 1000 tons, which will return an average of two and one-half ounces to the ton, a gross value of $50,000 for the month.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 27.09.2023 (09:44:35)
Above Info was First Seen 27.09.2023
Type/Category of Info:
General Mining News
Info Source From:
PROFITS; A Journal of Finance and Mining Worth While. Volume: 4 [IV], Issue No. 28Info Publication Date:
October 8, 1904Info found on page:
4Info Title:
Elkton Outputs 60 Tons Per Day
The production at the Elkton mine at Cripple Creek was raised to 60 tons a day several weeks ago. This output is being steadily maintained.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 26.09.2023 (12:36:53)
Above Info was First Seen 26.09.2023
Type/Category of Info:
General Mining News
Info Source From:
Mining Reporter. Volume: 49 [XLIX], Issue No. 2Info Publication Date:
January 14, 1904Info found on page:
44Info Title:
Doctor-Jackpot December Output
Doctor-Jack Pot.—The fifteen sets of lessees operating on this Raven hill property shipped 500 tons of ore within the month of December, the general average of which was about $35 per ton, the gross returns from the shipments having amounted to $18,000.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 25.08.2022 (08:49:27)
Above Info was First Seen 25.08.2022
Type/Category of Info:
Mining Inquiries
Info Source From:
United States Investor. Volume: 11 [XI], Issue No. 17Info Publication Date:
April 28, 1900Info found on page:
556Info Title:
Ingham Consolidated Gold Mining Co., Ltd. Info
The Ingham Consolidated Gold Mining Co., Ltd. belongs on a selected list, by no means complete, of low-priced Cripple Creek stocks, with the latest published information as to location, acreage, capitalization, and approximate present price being: Raven Hill, Cripple Creek; 15 acres; capital, 1,500,000 shares; par value, 50 cents; stock in treasury, 110,331; price, 24 cents.
The low-priced stocks are usually sold in "board lots" of not less than 1,000 shares. Smaller lots are also not readily salable. Shares in the Royalty can be obtained in lots of not less than 500.
Notes/Text been Edited:
Abstracted and slightly rewritten from source text.Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 27.02.2024 (16:15:50)
Above Info was First Seen 27.02.2024
Type/Category of Info:
General Mining News
Info Source From:
The Morning Times. Volume: 3 [III], Issue No. 259Info Publication Date:
February 16, 1896Info found on page:
1Info Title:
Buchanan Lease on Jack G. Give Returns
A shipment made a few days ago from the Buchanan lease on the Jack G. on Raven hill, to the Cripple Creek Sampler, gave returns of $110 to the ton.
A 200-ton lot, taken from the dump without sorting and sent to the Gold and Globe mill gave returns of $20 to the ton.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 14.02.2022 (22:32:43)
Above Info was First Seen 26.04.2010
Type/Category of Info:
General Mining News
Info Source From:
Akron Weekly Pioneer Press. Volume: 10 [X], Issue No. 32Info Publication Date:
June 14, 1895Info found on page:
4Info Title:
Tunnel being driven by Felix Berry and Cal Wagner
The tunnel being driven by Felix Berry and Cal Wagner is making great progress and is being very systematically worked, the intention being to cut the Jack G. vein.
This tunnel has been driven 600 feet into the side of the hill. The lessees have nine months remaining to work their lease and are now cutting into mineral.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 30.10.2020 (11:04:30)
Above Info was First Seen 26.07.2019