Detailed/More Info:
Vindicator Mill [ex Lillie Mine Structures]
This is a hidden text,
acting just like a spacer
type of text in order to
push the Entity info
down on the page. Sorry to have wasted your time/ear to listen to this, I was just trying to get a layout work like I wanted.
Info Database Last Updated 08.04.2024 (Entity News entries: 18)
Type/Category of Info:
General Mining News
Info Source From:
The Mining World. Volume: 25 [XXV], Issue No. 16
Info Publication Date:
October 20, 1906
Info found on page:
501
Info Title:
Vindicator Cyanide Mill at Old Lily Mine
Denver.—J. B. Shipman, formerly manager of Stratton's Independence, on Battle mountain, will at once begin active work on the construction of a cyanide mill on the ground of the Lily mine of the Vindicator Consolidated company on Bull hill, near Independence.
graphic for visual presentation of text The contract for the building of the machinery has been let to a Denver firm and the old Lily shafthouse will be used for the mill building. When the plant is completed, the ore on the Lily and Vindicator dumps will be treated and low-grade ore in the Vindicator mine will also be handled.
graphic for visual presentation of text It is understood that the plant will be in operation by January 1 and will have a capacity of 100 tons a day.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 06.11.2023 (16:13:05)
Above Info was First Seen 06.11.2023

Type/Category of Info:
Special/Editorial Correspondence
Info Source From:
The Mining and Scientific Press. Volume: 94 [XCIV], Issue No. 1
Info Publication Date:
January 5, 1907
Info found on page:
6
Info Title:
Vindicator Erects a Cyanide Mill in Old Lillie Shaft House
Annual Review.
graphic for visual presentation of textPopularity of Cyanidation.
graphic for visual presentation of text The Vindicator Consolidated Gold Mining Co. is erecting a small mill, at the present time, in the Lillie shaft-house, which belongs to that company. Low-grade ores running from $4 to $10 per ton will be handled, as well as sulphide ores, for the treatment of which an Edwards roaster has been installed.
Above Info was Last Updated on 10.10.2021 (18:51:24)
Above Info was First Seen 18.05.2021

Type/Category of Info:
General Mining News
Info Source From:
The Mining World. Volume: 26 [XXVI], Issue No. 2
Info Publication Date:
January 12, 1907
Info found on page:
48
Info Title:
Vindicator Consolidated Co. Mill Improvements
Denver.—A filter press has been installed at the new mill of the Vindicator Construction company in the Lily shaft house on Bull hill. An Edwards roaster, 125 tons' capacity, is already in place.
graphic for visual presentation of text The company will treat all its ores by this process and if it proves as successful as now anticipated the capacity of the mill will be doubled.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 10.11.2023 (18:25:39)
Above Info was First Seen 10.11.2023

Type/Category of Info:
General Mining News
Info Source From:
The Mining World. Volume: 26 [XXVI], Issue No. 7
Info Publication Date:
February 16, 1907
Info found on page:
254
Info Title:
Vindicator Mill Doing Well, Plans for New Larger Mill
Denver.—It is reported that the Vindicator mill is extracting 95 per cent from low-grade sulphide ores. It is understood that the Vindicator and Findlay companies jointly will build a mill of 200-tons capacity, work to begin in the next few weeks.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 12.11.2023 (15:31:03)
Above Info was First Seen 12.11.2023

Type/Category of Info:
General Mining News
Info Source From:
Mining Reporter. Volume: 55 [LV], Issue No. 10
Info Publication Date:
March 7, 1907
Info found on page:
228
Info Title:
Vindicator Mill February Output
The Vindicator reduction plant treated during February 300 tons of Cripple Creek ore.
Notes/Text been Edited:
Abstracted and slightly rewritten from source text.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 13.12.2023 (19:12:07)
Above Info was First Seen 06.06.2010

Type/Category of Info:
General Mining News
Info Source From:
The Mining World. Volume: 26 [XXVI], Issue No. 10
Info Publication Date:
March 9, 1907
Info found on page:
341
Info Title:
Vindicator Test Mill Shows Cyanide Works Well
Cripple Creek District.—Tests now being made in the Vindicator mill at the Lillie for the Findley and Vindicator indicates that it will pay every mine to have its own reduction plant. The test mill in question has the Edwards roasting furnace which can handle any sort of Cripple Creek rock at 30 cents a ton. It is said a 97 per cent extraction is secured.
Notes/Text been Edited:
Abstracted and slightly rewritten from source text.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 13.11.2023 (12:54:32)
Above Info was First Seen 13.11.2023

Type/Category of Info:
General Mining News
Info Source From:
Mining Reporter. Volume: 55 [LV], Issue No. 26
Info Publication Date:
June 27, 1907
Info found on page:
593
Info Title:
Vindicator Test Mill to Restart
Announcement is made of the early re-starting of the Vindicator company's experimental plant; the ore tests being made are under the direction of H. A. Shipman and R. J. Grant of Denver.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 20.07.2022 (19:29:27)
Above Info was First Seen 07.06.2010

Type/Category of Info:
Article
Info Source From:
Mineral Resources of the United States. Volume: 23 [XXIII]
Info Publication Date:
August 1907
Info found on page:
238
Info Title:
Vindicator Mill Test Work in 1906
During 1906 the Vindicator Company erected a testing mill in the Old Lillie shaft house at Independence, and made extensive tests preparatory to erecting a large plant.
Notes/Text been Edited:
Abstracted and slightly rewritten from source text.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 03.07.2022 (03:48:43)
Above Info was First Seen 10.05.2010

Type/Category of Info:
General Mining News
Info Source From:
Mining Reporter. Volume: 56 [LVI], Issue No. 7
Info Publication Date:
August 15, 1907
Info found on page:
161
Info Title:
Findley-Vindicator Experimental Plant at the Old Lillie Shaft is Expected to Be Started Up
The Findley-Vindicator experimental plant at the old Lillie shaft on Bull hill is expected to be started up about the 15th inst., and in the event of its proving a success, a 200-ton working plant is to be erected.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 20.07.2022 (19:31:46)
Above Info was First Seen 20.07.2022

Type/Category of Info:
General Mining News
Info Source From:
The Mining World. Volume: 27 [XXVII], Issue No. 7
Info Publication Date:
August 17, 1907
Info found on page:
286
Info Title:
Vindicator Experimental Mill Added Machinery
Denver.—A Kelley filter and a 50-ton tube mill have been installed at the experimental plant of the Vindicator and Findley Mining companies in the old shaft house at the Lillie mine.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 29.11.2023 (05:39:03)
Above Info was First Seen 29.11.2023

Type/Category of Info:
General Mining News
Info Source From:
The Mining World. Volume: 27 [XXVII], Issue No. 9
Info Publication Date:
August 31, 1907
Info found on page:
364
Info Title:
Vindicator-Findley Experimental Mill at Lillie Treats 40 Tons Daily
Cripple Creek—The Vindicator-Findley experimental mill at the Lillie is treating 40 tons daily. A plant of large capacity is now assured.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 01.12.2023 (08:09:51)
Above Info was First Seen 26.11.2010

Type/Category of Info:
General Mining News
Info Source From:
The Western Investors Review. Volume: 14 [XIV], Issue No. 5
Info Publication Date:
October 1907
Info found on page:
35
Info Title:
Vindicator (Experimental) Mill September 1907 Output
During September the Vindicator (Experimental) Mill processed 750 tons with an average value of $20.00 and a bullion value of $15,000.
Notes/Text been Edited:
Abstracted from source text in table and restyled/written to sentence form, also corrected the math sum.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 15.08.2023 (21:22:48)
Above Info was First Seen 18.10.2010

Type/Category of Info:
General Mining News
Info Source From:
Mining Reporter. Volume: 56 [LVI], Issue No. 15
Info Publication Date:
October 10, 1907
Info found on page:
338
Info Title:
Vindicator (Experimental) Mill September Output
During September the Vindicator (Experimental) Mill treated 750 tons at an average value of $20.00 for a total of $15,000.
Notes/Text been Edited:
Abstracted from source text in table and restyled/written to sentence form.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 23.07.2022 (12:18:32)
Above Info was First Seen 23.07.2022

Type/Category of Info:
General Mining News
Info Source From:
The Mining World. Volume: 27 [XXVII], Issue No. 19
Info Publication Date:
November 9, 1907
Info found on page:
863
Info Title:
Vindicator (Experimental) Mill October 1907 Output
During October the Vindicator plant processed 600 tons with an average value of $20.00 and a bullion value of $12,000.
Notes/Text been Edited:
Abstracted from source text in table and restyled/written to sentence form.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 10.12.2023 (12:02:46)
Above Info was First Seen 26.11.2010

Type/Category of Info:
Article
Info Source From:
The Mining World. Volume: 28 [XXVIII], Issue No. 4
Info Publication Date:
January 25, 1908
Info found on page:
135
Info Title:
Vindicator Consolidated Mill 1907 Production
An approximation of the value of the gold produced during 1907 by the Vindicator Consolidated at Cripple Creek (cyanidation) is $54,000.
Notes/Text been Edited:
Abstracted & slightly rewritten from larger text about 'The World's Supply of Gold & Silver', only taking the part linked to Cripple Creek
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 15.12.2023 (17:34:16)
Above Info was First Seen 15.12.2023

Type/Category of Info:
General Mining News
Info Source From:
The Mining World. Volume: 28 [XXVIII], Issue No. 4
Info Publication Date:
January 25, 1908
Info found on page:
164
Info Title:
Vindicator Mill 1907 Output
During 1907 the Vindicator plant processed 3,000 tons with an approximate bullion value of $54,000.
Notes/Text been Edited:
Abstracted from source text in table and restyled/written to sentence form.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 15.12.2023 (19:12:27)
Above Info was First Seen 28.11.2010

Type/Category of Info:
General Mining News
Info Source From:
The Mining and Scientific Press. Volume: 107 [CVII], Issue No. 2
Info Publication Date:
July 12, 1913
Info found on page:
72
Info Title:
Vindicator Production; June 1913
According to local statistics, the lessees at the Vindicator property are doing fairly well. An experimental cyanide plant is being erected at the Vindicator to treat dump ore.
Notes/Text been Edited:
Abstracted and somewhat rewritten slightly
Above Info was Last Updated on 13.12.2023 (19:03:35)
Above Info was First Seen 21.10.2019

Type/Category of Info:
General Mining News
Info Source From:
The Mining and Scientific Press. Volume: 120 [CXX], Issue No. 5
Info Publication Date:
January 31, 1920
Info found on page:
163
Info Title:
Vindicator Washing and Flotation Mill at Victor
In October 1919 the Vindicator washing and flotation mill at Victor was closed, so that less ore was available for the Golden Cycle mill.
Notes/Text been Edited:
Abstracted and slightly rewritten from source text; Statistical Review Production of Metal Mines for 1919 pages 163-166
Above Info was Last Updated on 13.12.2023 (19:05:09)
Above Info was First Seen 24.02.2020