General Mining News
Info Source From:
The Mining and Scientific Press. Volume: 121 [CXXI], Issue No. 22Info Publication Date:
November 27, 1920Info found on page:
776Info Title:
Blue Flag Happenings
Drifting east toward the Cresson, the Blue Flag Gold Mining Co. is prospecting toward the Cresson with promise of soon entering a richer zone. The vein as now broken is a low-grade mill product.
The Blue Flag is equipped with a milling plant not in operation at this time. Owing to poor ventilation during the recent heavy snow storms, work in the 1400 and 1200-ft. levels has been temporarily discontinued and is confined to the 800-ft. level.
Above Info was Last Updated on 02.02.2023 (17:09:01)
Above Info was First Seen 02.03.2020
Type/Category of Info:
General Mining News
Info Source From:
The Mining and Scientific Press. Volume: 121 [CXXI], Issue No. 22Info Publication Date:
November 27, 1920Info found on page:
776Info Title:
Blue Flag Mill Not Running
The Blue Flag is equipped with a milling plant not in operation at this time.
Notes/Text been Edited:
Abstracted from source text about the Blue Flag companyAbove Info was Last Updated on 30.10.2020 (11:04:30)
Above Info was First Seen 02.03.2020
Type/Category of Info:
General Mining News
Info Source From:
The Mining and Scientific Press. Volume: 121 [CXXI], Issue No. 7Info Publication Date:
August 14, 1920Info found on page:
246Info Title:
Blue Flag Happenings
Tests on Blue Flag ore at the plant of the Denver Engineering Works have proved satisfactory, and a flotation unit will be installed at the mill on Raven hill, to be running by the end of September. Equipment has been ordered.
Development at the 1200 and 1400-ft. levels is reported to be encouraging both as to the quantity and grade of ore under development.
The Blue Flag company owns property in the Patagonia mountains, Arizona, and following the recent development on the World's Fair group, immediately adjoining, the lease and option to purchase the Blue Flag group has been cancelled. The Arizona property is to be operated on company account.
Above Info was Last Updated on 02.02.2023 (17:09:17)
Above Info was First Seen 29.02.2020
Type/Category of Info:
General Mining News
Info Source From:
Mining Science. Volume: 66 [LXVI], Issue No. 1706Info Publication Date:
October 3, 1912Info found on page:
xxviiInfo Title:
Blue Flag Mill Satisfy After Week Operation
The Blue Flag mill has been in full operation a week. The results obtained so far have been satisfactory. The process involved is straight cyanide, the gold being dissolved by air agitation rather than leaching. The present capacity is 125 tons a day and the grade of the ore has been of the low class, not averaging more than $6.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 08.07.2023 (09:01:11)
Above Info was First Seen 08.07.2023
Type/Category of Info:
General Mining News
Info Source From:
Mining Science. Volume: 66 [LXVI], Issue No. 1703Info Publication Date:
September 12, 1912Info found on page:
xxviiInfo Title:
Blue Flag Mill Operating
After being closed down three months for repairs and changes, the Blue Flag mill, located on property owned by the company of that name, has resumed the grinding of ore. The plant has been materially enlarged under the direction of John Masson, a mill expert from Australia.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 07.07.2023 (09:43:03)
Above Info was First Seen 07.07.2023
Type/Category of Info:
General Mining News
Info Source From:
Mining Science. Volume: 66 [LXVI], Issue No. 1700Info Publication Date:
August 22, 1912Info found on page:
xxviiInfo Title:
Blue Flag Mill New Smokestack Raised
The new smoke stack has been raised over the mill building of the Blue Flag mine on Raven hill and the boiler is now being set in place and will be steamed up in the next few days.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 06.07.2023 (08:53:27)
Above Info was First Seen 06.07.2023
Type/Category of Info:
General Mining News
Info Source From:
Mining Science. Volume: 66 [LXVI], Issue No. 1699Info Publication Date:
August 15, 1912Info found on page:
xxvInfo Title:
Blue Flag Mill to Start Up Real Soon
The Blue Flag plant, which is a modern cyanide mill, will start up inside of a week. Since April 1, John Massion, who has had a good deal of experience in the Australian fields, has been supervising the rebuilding of the plant.
He has installed two Chilean mills and four Dorr thickeners have been put in.
Notes/Text been Edited:
Abstracted and slightly rewritten from source text.Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 05.07.2023 (11:17:23)
Above Info was First Seen 15.07.2010
Type/Category of Info:
General Mining News
Info Source From:
Mining Science. Volume: 65 [LXV], Issue No. 1690Info Publication Date:
June 13, 1912Info found on page:
xxxvInfo Title:
Blue Flag Mill Still Not Operating
The Blue Flag cyanide mill on Raven hill, owned by the Blue Flag Co., will not be in operation before the end of June. It will have a capacity of 150 tons a day.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 01.07.2023 (20:24:33)
Above Info was First Seen 15.07.2010
Type/Category of Info:
Personals
Info Source From:
Mining Science. Volume: 65 [LXV], Issue No. 1681Info Publication Date:
April 11, 1912Info found on page:
336Info Title:
Mr. John Masson Been Retained by Blue Flag Mining Co. As Metallurgist
John Masson, metallurgist, who has had much experience in milling in Australia, has been retained by the Blue Flag Mining Co. of Cripple Creek to make some changes in its plant and will be regularly employed as metallurgist.
Notes/Text been Edited:
Fixed spelling errorInternet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 27.06.2023 (09:15:36)
Above Info was First Seen 12.07.2010
Type/Category of Info:
General Mining News
Info Source From:
Mining Science. Volume: 65 [LXV], Issue No. 1677Info Publication Date:
March 21, 1912Info found on page:
ad32Info Title:
Blue Flag Co. Happenings
The cyanide mill of the Blue Flag Co., on the company's estate on Raven hill, is in operation and treating about 40 tons daily of oxidized ores from a large new body opened. It runs about $4 per ton. The company is carrying on extensive development.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 26.06.2023 (13:43:56)
Above Info was First Seen 26.06.2023
Type/Category of Info:
General Mining News
Info Source From:
The Engineering and Mining Journal. Volume: 92 [XCII], Issue No. 8Info Publication Date:
August 19, 1911Info found on page:
374Info Title:
Blue Flag Cyanide Mill Might Be Put to Work
Blue Flag—The cyanide plant on this property may be put in commission.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 02.02.2023 (17:12:27)
Above Info was First Seen 26.03.2019
Type/Category of Info:
General Mining News
Info Source From:
Mining Science. Volume: 64 [LXIV], Issue No. 1640Info Publication Date:
July 6, 1911Info found on page:
22Info Title:
Blue Flag Mill Getting Ready To Start Again
The Blue Flag mill is undergoing an overhauling, getting ready to start up.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 21.05.2023 (16:45:39)
Above Info was First Seen 21.05.2023
Type/Category of Info:
General Mining News
Info Source From:
Mining Science. Volume: 63 [LXIII], Issue No. 1639Info Publication Date:
June 29, 1911Info found on page:
675Info Title:
Blue Flag Mill to Shortly Resume Operations
Operations are shortly to be resumed at the Blue Flag mill on Raven hill.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 21.05.2023 (07:58:00)
Above Info was First Seen 21.05.2023
Type/Category of Info:
General Mining News
Info Source From:
Mining Science. Volume: 63 [LXIII], Issue No. 1637Info Publication Date:
June 15, 1911Info found on page:
628Info Title:
Blue Flag Mill to Operate Next Month
It is stated that the Blue Flag mill will be operating next month treating high-grade rock from the (Continued to Page 40, Advertising Section)?{missing text from source]
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 21.05.2023 (00:16:25)
Above Info was First Seen 20.05.2023
Type/Category of Info:
General Mining News
Info Source From:
Mining Science. Volume: 63 [LXIII], Issue No. 1616Info Publication Date:
January 19, 1911Info found on page:
73Info Title:
Blue Flag Expected in Operation Within 2 Months
The Blue Flag mill will be in operation within 60 days.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 08.05.2023 (09:23:18)
Above Info was First Seen 08.05.2023
Type/Category of Info:
General Mining News
Info Source From:
Mining Science. Volume: 62 [LXII], Issue No. 1612Info Publication Date:
December 22, 1910Info found on page:
610Info Title:
Blue Flag Mill Tanks Cleaned Out
The tanks in the cyanide plant of the Blue Flag have been cleaned out, some 50 tons of material being washed down the side of BullRaven hill.
Notes/Text been Edited:
Corrected location infoInternet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 05.05.2023 (20:10:18)
Above Info was First Seen 12.07.2010
Type/Category of Info:
General Mining News
Info Source From:
The Engineering and Mining Journal. Volume: 90 [XC], Issue No. 4Info Publication Date:
July 23, 1910Info found on page:
186Info Title:
Blue Flag Shuts Its Mill and Ships Elsewhere
Blue Flag—Shipments from this mine, between Bull and Raven hills, are now being made to outside plants, it being stated that the ore produced is too high grade for treatment at the company mill on the ground, which has been shut down.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 02.02.2023 (17:07:48)
Above Info was First Seen 24.03.2010
Type/Category of Info:
General Mining News
Info Source From:
Mining Science. Volume: 62 [LXII], Issue No. 1588Info Publication Date:
July 7, 1910Info found on page:
18Info Title:
Blue Flag Mill Still Inactive
The Blue Flag mill, on Raven hill, is still inactive, but will shortly resume.
Notes/Text been Edited:
Slightly rewritten from source textInternet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 24.04.2023 (10:08:46)
Above Info was First Seen 11.07.2010
Type/Category of Info:
General Mining News
Info Source From:
Mining Science. Volume: 61 [LXI], Issue No. 1575Info Publication Date:
April 7, 1910Info found on page:
331Info Title:
Blue Flag Mill March 1910 Output
During March the Blue Flag plant on Raven Hill processed 1,240 tons with an average value of $6.00 giving a total value of $7,440.
Notes/Text been Edited:
Abstracted from source text in table and restyled/written to sentence form.Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 19.04.2023 (09:09:09)
Above Info was First Seen 27.06.2010
Type/Category of Info:
General Mining News
Info Source From:
Mining Science. Volume: 61 [LXI], Issue No. 1571Info Publication Date:
March 10, 1910Info found on page:
236Info Title:
Blue Flag Mill February 1910 Output
During February the Blue Flag plant processed 700 tons with an average value of $6.00 giving a total value of $4,200.00.
Notes/Text been Edited:
Abstracted from source text in table and restyled/written to sentence form.Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 18.04.2023 (09:05:09)
Above Info was First Seen 27.06.2010
Type/Category of Info:
General Mining News
Info Source From:
Mining Science. Volume: 61 [LXI], Issue No. 1565Info Publication Date:
January 27, 1910Info found on page:
91Info Title:
Blue Flag Mill Operations Resumed
Operations have been resumed at the Blue Flag company's mill, on Raven hill, and it is again treating between 40 and 50 tons of ore daily.
It was temporarily shut down to permit of further development of large bodies of low-grade ore found in the Blue Flag mine, and it is understood that sufficient tonnage has been blocked out to keep it in operation at full capacity for an indefinite period.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 11.04.2023 (22:00:33)
Above Info was First Seen 24.06.2010
Type/Category of Info:
Article
Info Source From:
The Mineral Industry, Its Statistics, Technology & Trade in the U.S. and Other Countries. Volume: 17 [XVII]Info Publication Date:
July 26, 1909Info found on page:
919Info Title:
Blue Flag Uses a Tatman Grinding Mill
Of 1908 Progress in Crushing Machinery finds the Tatman Grinding Mill in use for instance at the Blue Flag cyanide mill at Cripple Creek, Colo., where it is used for grinding material from a Dodge breaker so that it will pass a 16-mesh screen.
- It resembles a Chili mill in having a central shaft and radial arms carrying mullers which travel around on a ring shaped die, but it differs in that the die is trough shaped and the mullers, of which there are seven, are rounded to fit the trough.
- The mill is 7 ft. in diameter and 4½ ft. high and weighs 18,000 lb.
- It reduces 50 tons of quartz from ½ in. to 20 mesh in 24 hours using 7 h.p.
- The chrome steel die ring is 6 ft. in diameter.
- The mullers with chrome steel tires are 22 in. in diameter and weigh 800 lb. each.
- The central shaft makes 100 r.p.m.
- The screen surface is 2 ft. high.
- For more info, see F. L. Barker's article from page 481 in the May 1908 issue of Mines and Minerals (Volume XXVIII).
Notes/Text been Edited:
Abstracted and slightly rewritten from source text about 'Progress in Ore Dressing and Coal Washing in 1908' by Robert H. Richards & Charles E. Locke.Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 25.05.2022 (08:34:18)
Above Info was First Seen 25.05.2022
Type/Category of Info:
General Mining News
Info Source From:
The Western Investors Review. Volume: 15 [XV], Issue No. 12Info Publication Date:
July 1909Info found on page:
10Info Title:
Blue Flag Mill June 1909 Output
During June the Blue Flag plant processed 1,250 tons with an average value of $6.00 and a bullion value of $7,500.
Notes/Text been Edited:
Abstracted from source text in table and restyled/written to sentence form.Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 24.08.2023 (12:21:29)
Above Info was First Seen 19.10.2010
Type/Category of Info:
General Mining News
Info Source From:
Mining and Scientific Press. Volume: 97 [XCVII], Issue No. 2512; 11Info Publication Date:
September 12, 1908Info found on page:
340Info Title:
Blue Flag Mill Resumed Operations
The Blue Flag mill, on the east slope of Raven hill, resumed operations last week, after a close-down of some time. The plant has been thoroughly overhauled and repaired, and is now in good shape to handle the output of the mine.
No attempt is being made to operate the plant at its full capacity, and only a portion of the full force was put to work. The mill is treating ore from the mine, having an average value of about $4 per ton.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 12.08.2023 (15:35:30)
Above Info was First Seen 28.09.2010
Type/Category of Info:
General Mining News
Info Source From:
The Mining World. Volume: 29 [XXIX], Issue No. 6Info Publication Date:
August 8, 1908Info found on page:
217Info Title:
Blue Flag Mill To Resume Work in August
Cripple Creek—During August the Blue Flag Co.'s mill will resume.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 30.12.2023 (12:26:01)
Above Info was First Seen 30.12.2023
Type/Category of Info:
Special/Editorial Correspondence
Info Source From:
Mining and Scientific Press. Volume: 96 [XCVI], Issue No. 2500; 25Info Publication Date:
June 20, 1908Info found on page:
834Info Title:
Blue Flag Mill Closed for Improvements
The Blue Flag, at Breckenridge, has suspended operations for a period of two months. Some of the machinery in the mill recently gave out, and the cessation of operation was originally made to allow time for repairs. Now the management has decided to completely re-equip the plant with new machinery.
To that end, additional electric appliances, drills, and minor equipment will be purchased.
Notes/Text been Edited:
AbstractedInternet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 09.08.2023 (19:48:09)
Above Info was First Seen 09.08.2023
Type/Category of Info:
General Mining News
Info Source From:
The Mining World. Volume: 28 [XXVIII], Issue No. 20Info Publication Date:
May 16, 1908Info found on page:
806Info Title:
Blue Flag Mill April 1908 Output
During April the Blue Flag plant processed 1,200 tons making a bullion value of $7,200.
Notes/Text been Edited:
Abstracted from source text in table and restyled/written to sentence form.Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 25.12.2023 (11:21:03)
Above Info was First Seen 25.12.2023
Type/Category of Info:
General Mining News
Info Source From:
The Mining World. Volume: 28 [XXVIII], Issue No. 17Info Publication Date:
April 25, 1908Info found on page:
686Info Title:
Blue Flag Mill Improves
Denver—The Blue Flag Mining Co., on Raven hill, during the month of March, treated 600 tons of ore of an average value of $6 and shipped several thousand dollars' worth of bullion. A Tatman pulverizer is being added.
The company's Laurium plant near Breckenridge is in constant operation and is turning out a high-grade concentrate. Another pulverizer is being added to this plant.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 23.12.2023 (09:06:38)
Above Info was First Seen 23.12.2023
Type/Category of Info:
General Mining News
Info Source From:
The Mining World. Volume: 28 [XXVIII], Issue No. 15Info Publication Date:
April 11, 1908Info found on page:
612Info Title:
Blue Flag Mill March 1908 Output
During March the Blue Flag plant processed 1,000 tons making a bullion value of $4,000.00.
Notes/Text been Edited:
Abstracted from source text in table and restyled/written to sentence form.Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 21.12.2023 (17:21:49)
Above Info was First Seen 21.12.2023
Type/Category of Info:
General Mining News
Info Source From:
The Mining World. Volume: 27 [XXVII], Issue No. 14Info Publication Date:
October 5, 1907Info found on page:
570Info Title:
Blue Flag G. M. Co. Mill Runs After Improvements at Property
Cripple Creek.—The new cyanide mill on Raven hill, built by the Blue Flag Gold Mining Co., is making its initial runs. Its capacity is 50 tons a day.
A new double hoisting engine has been placed in the Blue Flag shaft house and other improvements added to make certain that all grades of ore can be profitably handled.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 06.12.2023 (17:15:57)
Above Info was First Seen 06.12.2023
Type/Category of Info:
General Mining News
Info Source From:
The Mining World. Volume: 27 [XXVII], Issue No. 9Info Publication Date:
August 31, 1907Info found on page:
364Info Title:
Blue Flag Mill Getting Ready to Start
Cripple Creek—The Blue Flag mill is getting ready to start.
Notes/Text been Edited:
Abstracted and slightly rewritten from source text.Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 01.12.2023 (08:36:35)
Above Info was First Seen 26.11.2010
Type/Category of Info:
Article
Info Source From:
Mineral Resources of the United States. Volume: 23 [XXIII]Info Publication Date:
August 1907Info found on page:
238Info Title:
Blue Flag Mill Started in 1907
The Blue Flag Company's new mill was started in 1907.
Notes/Text been Edited:
Abstracted and slightly rewritten from source text.Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 03.07.2022 (03:44:26)
Above Info was First Seen 10.05.2010
Type/Category of Info:
General Mining News
Info Source From:
The Mining World. Volume: 27 [XXVII], Issue No. 3Info Publication Date:
July 20, 1907Info found on page:
116Info Title:
Blue Flag Mill Upgraded
Denver.—The Blue Flag Mining Co. is installing a new crusher in its mill on BullRaven hill. The works will start up this week with a capacity of 75 tons a day. There is a large supply of ore on hand.
Notes/Text been Edited:
Fixed location errorInternet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 27.11.2023 (17:18:58)
Above Info was First Seen 27.11.2023
Type/Category of Info:
General Mining News
Info Source From:
The Mining World. Volume: 26 [XXVI], Issue No. 26Info Publication Date:
June 29, 1907Info found on page:
819Info Title:
Blue Flag Mill Expected to Commence Work Soon
Cripple Creek.—The Blue Flag mill, adjoining the Joe Dandy property, will also commence treating ore from the Blue Flag this month.
Notes/Text been Edited:
Abstracted and slightly rewritten from source text.Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 26.11.2023 (09:40:47)
Above Info was First Seen 26.11.2023
Type/Category of Info:
Special/Editorial Correspondence
Info Source From:
The Mining and Scientific Press. Volume: 94 [XCIV], Issue No. 21Info Publication Date:
May 25, 1907Info found on page:
651Info Title:
Blue Flag Mill Looking Good
Cripple Creek, Colorado.
Experiments on Low-Grade Ores.
The experimental tests being conducted at the new Blue Flag cyanide mill are turning out favorably. About 25 tons of the low-grade ore is being handled, which will be increased to 75 tons per day when the tests are concluded.
Above Info was Last Updated on 10.10.2021 (18:51:24)
Above Info was First Seen 24.05.2021
Type/Category of Info:
Special/Editorial Correspondence
Info Source From:
The Mining and Scientific Press. Volume: 94 [XCIV], Issue No. 19Info Publication Date:
May 11, 1907Info found on page:
589Info Title:
Blue Flag Mill to Commence Operations
Cripple Creek, Colorado.
Blue Flag Cyanide Mill.
The cyanide mill of the Blue Flag Mining & Milling Co., on Bull hill, will commence operations during the next few days. Twenty-five tons of ore per day only will be treated at first until the plant is in full working order. The low-grade oxidized ores of the Blue Flag mine will be handled by the mill exclusively, there being several hundred tons already broken in the stopes.
Above Info was Last Updated on 10.10.2021 (18:51:24)
Above Info was First Seen 24.05.2021
Type/Category of Info:
General Mining News
Info Source From:
The Mining World. Volume: 26 [XXVI], Issue No. 19Info Publication Date:
May 11, 1907Info found on page:
607Info Title:
Blue Flag Mill to Operate Very Soon
Denver.—The cyanide mill of the Blue Flag Mining & Milling Company on BullRaven hill will probably be in operation this week; 25 tons a day of low-grade oxidized ore now being broken in the Blue Flag property, will be increased to 75 tons daily by the employment of a larger force.
Notes/Text been Edited:
Fixed location errorInternet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 20.11.2023 (09:14:01)
Above Info was First Seen 20.11.2023
Type/Category of Info:
General Mining News
Info Source From:
Mining Reporter. Volume: 55 [LV], Issue No. 8Info Publication Date:
February 21, 1907Info found on page:
189Info Title:
Blue Flag Cyanide Plant Near Completion
A cyanide plant in progress of erection at the Blue Flag property is being very near completion.
Notes/Text been Edited:
Abstracted and slightly rewritten from source text.Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 09.07.2022 (22:04:45)
Above Info was First Seen 06.06.2010
Type/Category of Info:
General Mining News
Info Source From:
The Mining World. Volume: 26 [XXVI], Issue No. 6Info Publication Date:
February 9, 1907Info found on page:
226Info Title:
Blue Flag Cyanide Mill Will Run Beacon Hill Ore
Denver.—The Blue Flag cyanide mill on Raven hill will be running this week—50 tons daily. It will treat custom ores from Beacon hill properties.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 12.11.2023 (05:54:34)
Above Info was First Seen 12.11.2023
Type/Category of Info:
General Mining News
Info Source From:
Mining Reporter. Volume: 54 [LIV], Issue No. 8Info Publication Date:
August 23, 1906Info found on page:
194Info Title:
Blue Flag Cyanide Mill Erection Commenced
Blue Flag.—Work was commenced last week on the erection of a 150-ton cyanide plant at this property. Large bodies of low grade ore have been opened up for treatment.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 25.02.2023 (08:07:08)
Above Info was First Seen 25.02.2023
Type/Category of Info:
General Mining News
Info Source From:
Mining Reporter. Volume: 53 [LIII], Issue No. 22Info Publication Date:
May 31, 1906Info found on page:
546Info Title:
Blue Flag Cyanide Mill Plans
Blue Flag.—Plans and specifications are being drawn up for a 100-ton cyanide mill, construction of which will probably commence by the middle of June. The plant will be located on Raven hill and will cost about $20,000.