Detailed/More Info:
Kimberly Mine
This is a hidden text,
acting just like a spacer
type of text in order to
push the Entity info
down on the page. Sorry to have wasted your time/ear to listen to this, I was just trying to get a layout work like I wanted.
Info Database Last Updated 08.04.2024 (Entity News entries: 24)
Type/Category of Info:
General Mining News
Info Source From:
The Morning Times. Volume: 7 [VII], Issue No. 270
Info Publication Date:
October 15, 1899
Info found on page:
1
Info Title:
Kimberly Fully in Ore
All five shafts on Kimberly ground on Beacon hill are in ore. A car load of from 4 to 6 ounce rock went out yesterday from block 4, sub from the Milliken lease.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 11.12.2021 (13:10:53)
Above Info was First Seen 01.08.2019

Type/Category of Info:
General Mining News
Info Source From:
The Engineering and Mining Journal.
Info Publication Date:
December 9, 1899
Info found on page:
708
Info Title:
Kimberly Gold Mining Company Annual Meeting
At the annual meeting of the stockholders the following directors where elected:
graphic for visual presentation of textW.F. Whalen
graphic for visual presentation of textJacob Seligman
graphic for visual presentation of textT.C. Delaney
graphic for visual presentation of textP.S. Delaney
graphic for visual presentation of textW.A. Delaney
graphic for visual presentation of text The number of the directors was increased from 3 to 5. The report of the manager shows that the property is worked under lease. Some of these leases have good ore. Considerable ore was shipped during the year.
graphic for visual presentation of text The properties are on the west slope of Beacon Hill, near the El Paso Company's property.
Above Info was Last Updated on 11.12.2021 (13:12:25)
Above Info was First Seen 31.01.2019

Type/Category of Info:
General Mining News
Info Source From:
PROFITS; A Journal of Finance and Mining Worth While. Volume: 3 [III], Issue No. 34
Info Publication Date:
November 21, 1903
Info found on page:
4
Info Title:
El Paso Consolidated G. M. Co. Mine in Splendid Condition
The El Paso Consolidated Gold Mining Company mine is in splendid condition, and the ore being marketed runs from $40 to $60 per ton.
Notes/Text been Edited:
Abstracted and slightly rewritten from source text.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 01.09.2023 (13:19:39)
Above Info was First Seen 01.09.2023

Type/Category of Info:
General Mining News
Info Source From:
Mining Reporter. Volume: 49 [XLIX], Issue No. 3
Info Publication Date:
January 21, 1904
Info found on page:
69
Info Title:
El Paso Consolidated in Splendid Shape
El Paso Consolidated.—It is stated that this Beacon hill property is now looking better than at any time during the past year. The manager states that although the recent stories of a great strike having been made are not true, still the mine is in splendid shape.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 26.08.2022 (08:35:27)
Above Info was First Seen 26.08.2022

Type/Category of Info:
General Mining News
Info Source From:
Mining Reporter. Volume: 49 [XLIX], Issue No. 23
Info Publication Date:
June 9, 1904
Info found on page:
592
Info Title:
El Paso May Shipments
El Paso.—This property on Beacon hill during the month of May shipped 900 tons which yielded values of $70 to the ton, or a total of $63,000. Besides this, four cars containing about 100 tons gave returns of $14,000 to the car, or $56,000 in all, making a gross total for the month $119,000.
graphic for visual presentation of text With the exception of the Portland, no other property in the district can equal this big production.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 15.09.2022 (14:42:54)
Above Info was First Seen 15.09.2022

Type/Category of Info:
General Mining News
Info Source From:
PROFITS; A Journal of Finance and Mining Worth While. Volume: 4 [IV], Issue No. 14
Info Publication Date:
July 2, 1904
Info found on page:
4
Info Title:
El Paso Consolidated Doing Great
Colorado Springs, Col., June 29. The Beacon Hill properties of the El Paso Consolidated will produce during the present month the sum of nearly $100,000. The company is now working in the neighborhood of 150 men.
Notes/Text been Edited:
Abstracted and slightly rewritten from source text.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 18.09.2023 (08:04:58)
Above Info was First Seen 18.09.2023

Type/Category of Info:
General Mining News
Info Source From:
PROFITS; A Journal of Finance and Mining Worth While. Volume: 4 [IV], Issue No. 17
Info Publication Date:
July 23, 1904
Info found on page:
4
Info Title:
El Paso Going Great
The El Paso mine, which endeavored during the first few months of this year to keep the production down to $50,000 or the usual dividend, has been producing so heavily that it has been necessary to close the mine at various times, commencing as early as the 20th of the month in some cases.
graphic for visual presentation of text As has been reported, it produced more than $100,000 last month, leaving $40,000 of ore in the bins to apply on the July production.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 21.09.2023 (08:18:57)
Above Info was First Seen 21.09.2023

Type/Category of Info:
General Mining News
Info Source From:
PROFITS; A Journal of Finance and Mining Worth While. Volume: 4 [IV], Issue No. 19
Info Publication Date:
August 6, 1904
Info found on page:
12
Info Title:
El Paso Consolidated Has Lot of Ore
Colorado Spring, August 4.—The El Paso Consolidated Company on Beacon Hill has enough ore in sight now to maintain the present rate of production for the next two years without doing another foot of development. That is saying considerable when the company is shipping about $150,000 worth of ore gross per month. This leaves a net profit of about $75,000 after all charges are subtracted.
graphic for visual presentation of text Sinking has been suspended at a depth of 785 feet, or at a point 230 feet below the level. The stations are being cut, the seventh and eighth levels are to be extended and as soon as they are far enough away from the shaft, sinking will be resumed for an additional 200 feet, making the shaft 985 feet below the collar when completed.
Notes/Text been Edited:
Fixed a typo on the Beacon Hill spelling, source had 'Bacon'
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 22.09.2023 (08:36:48)
Above Info was First Seen 22.09.2023

Type/Category of Info:
General Mining News
Info Source From:
PROFITS; A Journal of Finance and Mining Worth While. Volume: 4 [IV], Issue No. 28
Info Publication Date:
October 8, 1904
Info found on page:
4
Info Title:
El Paso September 1904 Output
The tonnage from the El Paso, at Cripple Creek, for September, will amount to about 75 carloads, each containing 25 tons. The company will ship 45 cars, averaging between $80 and $100, and the balance will be the result of the lessees' operations, and will average $30 to the ton.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 26.09.2023 (12:25:10)
Above Info was First Seen 26.09.2023

Type/Category of Info:
General Mining News
Info Source From:
Mining Reporter. Volume: 50 [L], Issue No. 26
Info Publication Date:
December 29, 1904
Info found on page:
711
Info Title:
El Paso Happenings

El Paso.—For the past three months there has been shipped from this Beacon hill mine upwards of 135 cars of ore valued at about $260,000 and the gross production for the last half of the year has exceeded $500,000.

With the working force, which numbers 170 men, it is questionable if this record is exceeded by any in the district.

  • The ore shipped is largely mined at present in 500, 600 and 700-foot northeast levels which are being extended into the recently acquired Beacon Hill-Ajax property.
  • In the 700-foot level the water, amounting to about 120 gallons per minute, is dropped to the 800-foot level, thence pumped to the drainage tunnel at the 600-foot level.
  • The present flow from the El Paso drainage tunnel amounts to about 4,700 gallons per minute as compared with 5,700 gallons three or four months ago.
  • The Lonaconing mine, owned by the El Paso company, is now under lease to Wyatt and Burnside, who are making regular shipments, amounting to about ten cars monthly.

W. M. Bainbridge is the manager in charge of the El Paso company's mine operations.

Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 08.10.2022 (12:34:05)
Above Info was First Seen 17.05.2010

Type/Category of Info:
General Mining News
Info Source From:
The Mining World. Volume: 27 [XXVII], Issue No. 12
Info Publication Date:
September 21, 1907
Info found on page:
486
Info Title:
El Paso Mine to Be Leased Out
Cripple Creek.—The El Paso Con. Gold Mining Co. has decided to lease the entire workings above the 600 level. About everything below that is under water.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 04.12.2023 (10:55:15)
Above Info was First Seen 26.11.2010

Type/Category of Info:
General Mining News
Info Source From:
The Mining World. Volume: 28 [XXVIII], Issue No. 20
Info Publication Date:
May 16, 1908
Info found on page:
806
Info Title:
El Paso Cons. G. M. Co. Has Adopted the Leasing System Exclusively
Cripple Creek—The El Paso Cons. Gold Mining Co. has adopted the leasing system exclusively and has now a score of leases operating above the water level. During the month 70 cars were sent out from these leases, the ore yielding about $30 a ton.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 25.12.2023 (11:33:18)
Above Info was First Seen 25.12.2023

Type/Category of Info:
Special/Editorial Correspondence
Info Source From:
Mining and Scientific Press. Volume: 96 [XCVI], Issue No. 2498; 23
Info Publication Date:
June 6, 1908
Info found on page:
765
Info Title:
All El Paso Con. Gold Mining Co. Ground to Be Leased Out
DENVER, COLORADO.—The president of the El Paso Con. Gold Mining Co. has announced that all El Paso territory will be leased, despite the protest of J. F. Burns. Over 100 applications have been made for the few remaining blocks of ground.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 08.08.2023 (13:51:37)
Above Info was First Seen 08.08.2023

Type/Category of Info:
General Mining News
Info Source From:
The Sun. Volume: 76 [LXXVI], Issue No. 70
Info Publication Date:
November 9, 1908
Info found on page:
7
Info Title:
El Paso Consolidated Co. Property Developed by Leesees
COLORADO SPRINGS, Nov. 4.—The El Paso Consolidated Companies property, Cripple Creek, is being developed by 25 sets of lessees, the majority of whom are actively producing a good grade of ore. The monthly output is 80 cars. The ore averages $25 to $30 per ton.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 30.03.2024 (12:47:11)
Above Info was First Seen 28.07.2017

Type/Category of Info:
General Mining News
Info Source From:
Mining Science. Volume: 59 [LIX], Issue No. 1519
Info Publication Date:
March 11, 1909
Info found on page:
196
Info Title:
El Paso February Output
The lessees on the El Paso dump have been shipping considerable ore, as also have the lessees on the various properties of that company.
graphic for visual presentation of text The total output for February is something in excess of 1,900 tons.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 12.03.2022 (07:31:10)
Above Info was First Seen 17.06.2010

Type/Category of Info:
Special/Editorial Correspondence
Info Source From:
Mining and Scientific Press. Volume: 98 [XCVIII], Issue No. 2547; 20
Info Publication Date:
May 15, 1909
Info found on page:
682
Info Title:
El Paso Consolidated Gold Mining Co. Has Let 31 Leases on Its Beacon Hill Estate
DENVER, COLORADO—The El Paso Consolidated Gold Mining Co. has let 31 leases on its Beacon Hill estate. This mine will be the first benefited by the drainage tunnel, and vigorous preparations are being made to take advantage of that event.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 20.04.2022 (18:30:48)
Above Info was First Seen 20.04.2022

Type/Category of Info:
General Mining News
Info Source From:
Mining and Scientific Press. Volume: 98 [XCVIII], Issue No. 2548; 21
Info Publication Date:
May 22, 1909
Info found on page:
709
Info Title:
El Paso April Output and Being Leased Hopes to Increase
The El Paso Consolidated Gold Mining Co.'s estate that last year produced $243,000 under the leasing system has, with the exception of certain blocks reserved for operation on company account, been thrown open to lessees, and already 31 sets of lessees, employing about 150 miners, are at work. The royalties are graduated from 15% on low-grade milling ore to as high as 50% on the high grade.
graphic for visual presentation of text Output in April amounted to 2000 tons of an average value of $27, and it is confidently expected that by the end of May production will be increased by adding to the number of lessees at work.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 20.04.2022 (18:58:09)
Above Info was First Seen 20.04.2022

Type/Category of Info:
General Mining News
Info Source From:
Mining and Scientific Press. Volume: 99 [XCIX], Issue No. 2562; 9
Info Publication Date:
August 28, 1909
Info found on page:
277
Info Title:
El Paso Consolidated Co. Has 30 Sets of Lessees Working Properties
There are 30 sets of lessees at work on the property of the El Paso Consolidated company and it is expected the August output will approximate 2000 tons.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 23.04.2022 (09:00:02)
Above Info was First Seen 23.04.2022

Type/Category of Info:
General Mining News
Info Source From:
Mining Science. Volume: 60 [LX], Issue No. 1554
Info Publication Date:
November 11, 1909
Info found on page:
451
Info Title:
El Paso Estate October Production
The properties of the El Paso Co. on Beacon hill, locally designated the El Paso estate, with the exception of certain blocks reserved for operation on company account, are operated under the leasing system, and the output for October by the 40 different sets of lessees totaled 80 cars, containing over 2,000 tons, with an average value of about $25 per ton.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 13.04.2022 (08:46:46)
Above Info was First Seen 22.06.2010

Type/Category of Info:
Special/Editorial Correspondence
Info Source From:
The Engineering and Mining Journal. Volume: 90 [XC], Issue No. 3
Info Publication Date:
July 16, 1910
Info found on page:
134
Info Title:
El Paso Consolidated June Production
Denver, July 11—The properties of the El Paso Consolidated Mining Company, on Beacon hill, in the Cripple Creek district, which are the first to be unwatered by the deep drainage tunnel, produced in June under the leasing system approximately 2500 tons, the average gold content of which was about $30 per ton. There are 40 sets of lessees in the mines.
graphic for visual presentation of text Drilling of the 8-in. hole to connect with the drainage tunnel has been commenced. It is 14,484 ft. from the portal of the Roosevelt (more commonly known as the Deep Drainage) tunnel to a point 65-ft. east of the El Paso shaft, 14,000 ft. of which has been completed, leaving only about 484 ft. to be driven.
Notes/Text been Edited:
Abstracted from source text.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 18.12.2021 (15:41:04)
Above Info was First Seen 18.12.2021

Type/Category of Info:
General Mining News
Info Source From:
The Engineering and Mining Journal. Volume: 90 [XC], Issue No. 7
Info Publication Date:
August 13, 1910
Info found on page:
335
Info Title:
El Paso Workings
El Paso—Work on the drill hole from the bottom of the El Paso shaft, to connect with the deep-drainage tunnel, has been delayed because of the nondelivery of casing.
graphic for visual presentation of text Lessees operating on the Beacon Hill-Ajax claim of the El Paso company are breaking ore from a 5-ft. vein, discovered north of the shaft on the 400-ft. level.
graphic for visual presentation of text During June 375 tons were shipped, while 125 tons have been produced from these workings this month, yielding $35 per ton. A strong vein is reported as having been cut by the deep-drainage tunnel in the Orizaba claim, but no tests were made by the tunnel contractor.
graphic for visual presentation of text Excavation has been completed for the new No. 2 shafthouse, situated at the north end of Beacon hill.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 20.12.2021 (07:44:28)
Above Info was First Seen 24.03.2010

Type/Category of Info:
General Mining News
Info Source From:
The Engineering and Mining Journal. Volume: 90 [XC], Issue No. 25
Info Publication Date:
December 17, 1910
Info found on page:
1225
Info Title:
El Paso Lessees November Output
El Paso—The output of the El Paso mine for November by lessees was 75 cars, of an average value of $22.50 per ton. Machines have been put to work on the fifth level, and the sixth level is being cleaned out.
graphic for visual presentation of text Now the lower levels have been unwatered, the output will be largely increased.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 26.12.2021 (07:52:05)
Above Info was First Seen 26.03.2010

Type/Category of Info:
General Mining News
Info Source From:
The Engineering and Mining Journal. Volume: 90 [XC], Issue No. 26
Info Publication Date:
December 24, 1910
Info found on page:
1275
Info Title:
El Paso Consolidated Getting Ready for Production
El Paso Consolidated—The fifth and sixth levels are being put in shape for production, and the pump on the sixth level will be raised in a few days.
graphic for visual presentation of text These levels have been flooded for five years.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 26.12.2021 (16:02:12)
Above Info was First Seen 26.03.2010

Type/Category of Info:
General Mining News
Info Source From:
Mining Science. Volume: 66 [LXVI], Issue No. 1711
Info Publication Date:
November 7, 1912
Info found on page:
xxvii
Info Title:
Sampling of El Paso Mine Completed
Sampling of the El Paso mine by Engineer T. R. Countryman has been completed. He had a crew of 10 men working nearly three months, making a complete check of every ore body in the mine figured from the top to the tunnel level. The check is thorough in every particular and upon it depends the construction of a low-grade mill for which preliminary plans have been made in the way of securing water rights, etc.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 09.07.2023 (08:51:50)
Above Info was First Seen 09.07.2023