Detailed/More Info:
Bull Hill Mining and Tunnel Company Tunnel
This is a hidden text,
acting just like a spacer
type of text in order to
push the Entity info
down on the page. Sorry to have wasted your time/ear to listen to this, I was just trying to get a layout work like I wanted.
Info Database Last Updated 08.04.2024 (Entity News entries: 1)
Type/Category of Info:
Article
Info Source From:
The Morning Times. Volume: 3 [III], Issue No. 259
Info Publication Date:
February 16, 1896
Info found on page:
1
Info Title:
Bull Hill Mining and Tunnel Co. Tunnel
In connection with the tunnel the Electric Tramway and Tunnel company is boring into Bull hill from the northwest, another should be mentioned, that of the Bull Hill Mining and Tunnel company, which enters the hill from the southeast slope and is driving in the opposite direction.
graphic for visual presentation of text The surveys have been so made that these two tunnels will meet about half way making a continuous passage through Bull hill, the total length of which is 5,840 feet.
graphic for visual presentation of text The Electric Tramway company has for its president C. M. Rice; vice-president, Isaac Schiff; secretary and treasurer, W. E. Bridgeman; manager, C. B. Wider. Max Straus, a St. Louis capitalist who has made heavy investment in the camp, is one of the directors.
graphic for visual presentation of text
Notes/Text been Edited:
Abstracted and slightly rewritten from source text.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 12.02.2022 (21:22:21)
Above Info was First Seen 26.04.2010