Sort on Published Date;
Oldest First |
Newest First OR,
Sort on Info First Seen/Last Updated at Top
Info Database Last Updated 08.04.2024 (Entity News entries: 1)
Type/Category of Info:
General Mining News
Info Source From:
The Mining World. Volume: 27 [XXVII], Issue No. 11Info Publication Date:
September 14, 1907Info found on page:
447Info Title:
Masterpiece Tunnel to Get 6-Drill Compressor
Cripple Creek.—Preparations are being made to install a 6-drill compressor at the Masterpiece tunnel through which the Masterpiece Gold Mining Co. is developing its 53 acres of patented ground on the eastern portion of Bull hill.
The tunnel has been driven more than 300 ft. and will open and develop seven known veins. Plans are being prepared for a 50-ton cyanide mill to treat the company's ores in the 14-ft. vein that has been developed.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 03.12.2023 (12:35:18)
Above Info was First Seen 26.11.2010