Detailed/More Info:
Thompson Mine [aka Thomson lode]
This is a hidden text,
acting just like a spacer
type of text in order to
push the Entity info
down on the page. Sorry to have wasted your time/ear to listen to this, I was just trying to get a layout work like I wanted.
Info Database Last Updated 08.04.2024 (Entity News entries: 15)
Type/Category of Info:
Article
Info Source From:
The Morning Times. Volume: 9 [IX], Issue No. 24
Info Publication Date:
December 31, 1899
Info found on page:
7 (3)
Info Title:
1899 Dividends for Thompson G. M. Co
During 1899 it was paid in Dividends by the Thompson G. M. Co. $156,000
Notes/Text been Edited:
Abstracted from source text talking about many companies
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 30.10.2020 (11:04:30)
Above Info was First Seen 22.07.2020

Type/Category of Info:
General Mining News
Info Source From:
The Engineering and Mining Journal. Volume: 75 [LXXV], Issue No. 13
Info Publication Date:
March 28, 1903
Info found on page:
497
Info Title:
Strike Shut Down the Tompson
Besides the Stratton's Independence the Tompson have shut down.
graphic for visual presentation of text What ore is mined is stored and not shipped, owing to the labor troubles. There are about 718 men now idle in the district.
Notes/Text been Edited:
Abstracted from a somewhat longer text mention many other mines also affected of the strike.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 30.10.2020 (11:04:30)
Above Info was First Seen 04.02.2019

Type/Category of Info:
General Mining News
Info Source From:
The Engineering and Mining Journal. Volume: 75 [LXXV]
Info Publication Date:
April 4, 1903
Info found on page:
537
Info Title:
Thompson closed due the Strike Situation
The situation is somewhat improved, but not yet settled. A number of concessions have been made by both sides. At present it seems as though the strike at the Standard mill would be settled, as all the demands of the union men at the mill have been met with, except as to the reinstatement of some of the striking mill men. If the trouble is not settled very soon a number of mines will have to close from having no marked for their ore.
graphic for visual presentation of text
graphic for visual presentation of text At present the Thompson mine is shut down due to the strike.
Notes/Text been Edited:
Abstract, rewritten from a somewhat larger text.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 30.10.2020 (11:04:30)
Above Info was First Seen 31.01.2019

Type/Category of Info:
General Mining News
Info Source From:
Mining Reporter. Volume: 49 [XLIX], Issue No. 2
Info Publication Date:
January 14, 1904
Info found on page:
44
Info Title:
Wright lease on Thompson December Shipments
Thompson Lease.—Lessee Wright, operating this property, which belongs to the Elkton company, mined and shipped 2,800 tons of ore in the month of December, the average of which was $20 per ton, making a gross production for the month of $60,000.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 25.08.2022 (08:47:23)
Above Info was First Seen 25.08.2022

Type/Category of Info:
General Mining News
Info Source From:
Mining Reporter. Volume: 49 [XLIX], Issue No. 3
Info Publication Date:
January 21, 1904
Info found on page:
69
Info Title:
Thompson Lessees Workings
Elkton.—The lessees on the Thompson claim of this company recently shipped three carloads of ore which returned values of over an ounce of gold to the ton. The shipments are steady and of good value.
graphic for visual presentation of text The lessees on the dump are making a production of about seven car loads of ore a month, with assays of about $16 a ton.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 26.08.2022 (08:41:47)
Above Info was First Seen 26.08.2022

Type/Category of Info:
General Mining News
Info Source From:
Mining Reporter. Volume: 49 [XLIX], Issue No. 4
Info Publication Date:
January 28, 1904
Info found on page:
96
Info Title:
Thompson Leased by James Wright
The lease on the Thompson claim of the Elkton company, which expires on February 10th, has been renewed to James Wright. Mr. Wright is taking out ore from the first to the Sixth level, and the grade this month is said to be better than that mined in December. It is expected that his shipments will aggregate over 1,300 tons for January, the ore running better than one ounce to the ton.
Notes/Text been Edited:
Abstracted and slightly rewritten from source text.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 26.08.2022 (09:45:36)
Above Info was First Seen 26.08.2022

Type/Category of Info:
General Mining News
Info Source From:
PROFITS; A Journal of Finance and Mining Worth While. Volume: 4 [IV], Issue No. 28
Info Publication Date:
October 8, 1904
Info found on page:
4
Info Title:
Elkton Outputs 60 Tons Per Day
The production at the Elkton mine at Cripple Creek was raised to 60 tons a day several weeks ago. This output is being steadily maintained.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 26.09.2023 (12:36:53)
Above Info was First Seen 26.09.2023

Type/Category of Info:
General Mining News
Info Source From:
PROFITS; A Journal of Finance and Mining Worth While. Volume: 4 [IV], Issue No. 48
Info Publication Date:
February 25, 1905
Info found on page:
2
Info Title:
Elkton Operations on Tremendous Scale
Colorado Springs, Col., Feb. 20.—On the Elkton property operations are being carried forward on a tremendous scale, not only by the company, but by different lessees and from the different operators between 3000 and 4000 tons of ore are going out each month, which leaves a profit balance of over $25,000 to the company each thirty days.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 11.10.2023 (17:46:09)
Above Info was First Seen 11.10.2023

Type/Category of Info:
General Mining News
Info Source From:
The Mining World. Volume: 24 [XXIV], Issue No. 6
Info Publication Date:
February 10, 1906
Info found on page:
226
Info Title:
Elkton Doing OK
Denver, Colo.—During January three new strikes were made in the Elkton property, in blocks 7, 8, and 13, at different depths. The company is working 100 men.
graphic for visual presentation of text The Hayden lease on the Gregory claim of the Elkton has cleaned up about $300,000 in the last six months. The royalties paid from this lease have furnished sufficient funds to pay for the large amount of development work performed by the company in the main workings of the Elkton proper.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 28.10.2023 (10:11:48)
Above Info was First Seen 28.10.2023

Type/Category of Info:
General Mining News
Info Source From:
The Mining World. Volume: 25 [XXV], Issue No. 2
Info Publication Date:
July 14, 1906
Info found on page:
48
Info Title:
Elkton High Grade Strike at Level 5
Cripple Creek.—The strike recently made in the fifth level of the Elkton, on Raven hill, promises to become one of the greatest rinds in the district. The vein carrying the rich ore is located 75 feet west of the main shaft, and as development work continues it increases in width. All the way across it gives returns of $35 to the ton, while small knifeblade seams carry values as high as $400 and $500.
graphic for visual presentation of text The Elkton is crosscutting now for an extension of the vein in the fourth level, and it is expected to expose the ore body proper with any round of shots.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 03.11.2023 (10:51:53)
Above Info was First Seen 03.11.2023

Type/Category of Info:
General Mining News
Info Source From:
The Mining World. Volume: 25 [XXV], Issue No. 26
Info Publication Date:
December 29, 1906
Info found on page:
787
Info Title:
Elkton Shipped 24 Cars in December
Denver.—The Elkton has shipped thus far this month 24 cars of 2-ounce grade. The output for December is reckoned at $50,000.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 09.11.2023 (17:20:35)
Above Info was First Seen 09.11.2023

Type/Category of Info:
Special/Editorial Correspondence
Info Source From:
The Mining and Scientific Press. Volume: 94 [XCIV], Issue No. 8
Info Publication Date:
February 23, 1907
Info found on page:
234
Info Title:
Thompson Leased to Western Investment Co.
The Thompson is Leased.
graphic for visual presentation of text A lease has been granted on the Thompson mine of the Elkton Co. to the Western Investment Co. Machinery is being moved on to the ground, and air-drills will be put to work on the upper levels of the mine.
graphic for visual presentation of text The ore averages about an ounce in gold and should give fair profits at the present rates of freight and treatment. This property was formerly under lease to James Wright, who took out some fair-grade ore.
Above Info was Last Updated on 10.10.2021 (18:51:24)
Above Info was First Seen 17.05.2021

Type/Category of Info:
General Mining News
Info Source From:
The Mining World. Volume: 27 [XXVII], Issue No. 9
Info Publication Date:
August 31, 1907
Info found on page:
364
Info Title:
Elkton Con. Ships Rate of 1,200 Tons Monthly
Cripple Creek—The Elkton Con., working one shift six days a week, continues to ship at the rate of 1,200 tons monthly and the net smelting returns are about $35,000.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 01.12.2023 (08:59:05)
Above Info was First Seen 26.11.2010

Type/Category of Info:
General Mining News
Info Source From:
Mining Science. Volume: 60 [LX], Issue No. 1539
Info Publication Date:
July 29, 1909
Info found on page:
97
Info Title:
Thompson Claim Have Large Bodies of Low-Grade Milling Ore
Recent development work by the Elkton Co. carried on south of the main shaft on the Thompson claim has resulted in the disclosure of large bodies of low-grade milling ore.
graphic for visual presentation of text The mineral found in the granite formation ranges in value from $6 to $14 per ton.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 03.04.2022 (14:36:12)
Above Info was First Seen 20.06.2010

Type/Category of Info:
General Mining News
Info Source From:
The Mining and Scientific Press. Volume: 118 [CXVIII], Issue No. 14
Info Publication Date:
April 5, 1919
Info found on page:
474
Info Title:
Thompson in Rich Shoot
H. Chapman, lessee of the Elkton Consolidated, operating south of the shaft in the Thompson claim, at a depth of 600 ft., has cut a new and rich shoot in virgin ground. Four cars shipped during the present week from the discovery have been sampled by the Eagle Ore Co. in transit to the Golden Cycle at Colorado Springs, and returned 2.19 to 2.50 oz.
graphic for visual presentation of text No work has been done in the Thompson claim above the Chapman shoot, and it is believed that the ore will extend to the surface.
Above Info was Last Updated on 30.10.2020 (11:04:30)
Above Info was First Seen 05.03.2020