Detailed/More Info:
Dexter Mine
This is a hidden text,
acting just like a spacer
type of text in order to
push the Entity info
down on the page. Sorry to have wasted your time/ear to listen to this, I was just trying to get a layout work like I wanted.
Info Database Last Updated 08.04.2024 (Entity News entries: 31)
Type/Category of Info:
Mining Inquiries
Info Source From:
United States Investor. Volume: 10 [X], Issue No. 19
Info Publication Date:
May 13, 1899
Info found on page:
628
Info Title:
Dexter Gold Mining & Milling Co. Inquiry
Dexter Gold Mining & Milling Co.
graphic for visual presentation of text 4114. (Oswego, N. Y.) Kindly learn and report the value of stock and prospects of the Dexter Gold Mining & Milling Company, Cripple Creek, Colo.
graphic for visual presentation of text
graphic for visual presentation of text Ans.: Our Colorado correspondent writes: "In the absence of the name of the president and secretary of this company (which could have been furnished from the face of the certificate), or the names of the claims, or location of the property, it has not been possible to obtain the information desired.
graphic for visual presentation of text I never before heard of the company, and after diligent inquiry, the only item I have obtained is from a gentleman closely connected with Cripple Creek for the last seven years, who says he thinks a company of the above name has some ground on Bull Hill, but its headquarters are in New York or some other eastern city, and therefore little is known of it in Colorado.
graphic for visual presentation of text
graphic for visual presentation of text "The following clipping from the Colorado Springs 'Gazette,' of the 28th ult., refers to certain developments on the Dexter claim, which is a well located claim. Whether this claim is the property of the Dexter Gold Mining & Milling Company, we cannot learn:
graphic for visual presentation of text "Work on the Dexter has been greatly lessened the past week on account of the absence of Manager Edwards. At the same time considerable ore is broken by the small force as the vein is so easily mined. One man has been known to break 20 tons with one shot. There is no doubt but that the Dexter will make a great mine with developments. The ore is not very high grade, but on account of the size of the vein and its cheapness of mining it must certainly become a bonanza.
graphic for visual presentation of text
graphic for visual presentation of text "Von Hemert & Co., of the Midland sampler, secured a lease on the block adjoining a couple of weeks ago, and have fitted up a 15-horsepower electric hoist and built a house over it. Actual mining has begun, with two shifts of men drifting southwest, with the object of cutting the Blue Bird and also the Dexter veins at a depth of 120 feet. It is expected to require about 30 days of mining to accomplish the desired result."
graphic for visual presentation of text
graphic for visual presentation of text "This company appears to be unknown among the leading mining brokers of Colorado Springs."
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 10.02.2024 (19:27:27)
Above Info was First Seen 10.02.2024

Type/Category of Info:
General Mining News
Info Source From:
The Morning Times-Citizen. Volume: 10 [X], Issue No. 75
Info Publication Date:
March 1, 1900
Info found on page:
3
Info Title:
Dexter Shipment
DEXTER MAKES SHIPMENT
graphic for visual presentation of text—————————
graphic for visual presentation of text The Dexter Mining and Milling company made a shipment of 28 tons of ore, which it is expected will bring something like $45 per ton.
graphic for visual presentation of text Von Hemert & Jolly are the lessees operating the mine.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 01.02.2022 (08:19:25)
Above Info was First Seen 15.11.2020

Type/Category of Info:
Article
Info Source From:
The Cripple Creek Times. Issue No. 1
Info Publication Date:
January 1, 1903
Info found on page:
49
Info Title:
Rose Nicol Gold Mining Company
Good Prospective Mining Territory Controlled by The Reed Investment Co. of Colorado Springs

THE ROSE NICOL GOLD MINING CO.

In the early part of the year 1901 The Reed Investment Company, of which Mr. Verner Z. Reed is president and O. H. Shoup secretary, adopted a policy of working the properties which they controlled by the leasing system.

They were among the first to inaugurate a longer time lease with a lower royalty, so that on all the properties which they control, there has been active development work carried on during the past year by lessees.

The Rose Nicol Gold Mining company own the Rose, part of the Big Banta, part of the Dexter and Last Effort, lying just north of the property of the Portland Gold Mining company.

The main shaft is down 450 feet and during the past year there have been from two to three sets of lessees working upon the property.

So far no ore has been shipped from the Rose Nicol properties, but the location of the company's ground is good.

Notes/Text been Edited:
Abstracted and slightly rewritten from source text.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 11.10.2021 (21:04:43)
Above Info was First Seen 09.09.2021

Type/Category of Info:
General Mining News
Info Source From:
Mining Reporter. Volume: 49 [XLIX], Issue No. 7
Info Publication Date:
February 18, 1904
Info found on page:
176
Info Title:
Dexter Workings
Dexter.—This property is being worked by the Colorado Leasing, Mining and Milling Company, which is sinking the shaft from the 560-foot level to the 620-foot point, at which point laterals and crosscuts will be run. At the 650-foot level a crosscut is being run to open up the ore body which furnished so much ore 200 feet above.
graphic for visual presentation of text It is expected that this ore shoot will be encountered in the next thirty feet. Ore is being mined at several points. Several surface improvements have recently been completed, including a large plant of machinery. It is said the company now proposes the erection of a fifty-ton cyanide plant.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 25.09.2022 (08:30:22)
Above Info was First Seen 28.08.2022

Type/Category of Info:
General Mining News
Info Source From:
Mining Reporter. Volume: 49 [XLIX], Issue No. 13
Info Publication Date:
March 31, 1904
Info found on page:
331
Info Title:
Dexter to Sink Further
Dexter.—The shaft on this Bull Hill property is being sunk to the 1,000 foot point in the hope of recovering the vein opened on the 900-foot level of the Blue Bird.
graphic for visual presentation of text Occasional shipments are being made of ore taken from between the 300 and 500-foot levels.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 01.09.2022 (08:51:03)
Above Info was First Seen 01.09.2022

Type/Category of Info:
General Mining News
Info Source From:
Mining Reporter. Volume: 50 [L], Issue No. 6
Info Publication Date:
August 11, 1904
Info found on page:
148
Info Title:
Colorado Leasing Co. Want Its Lease Back
Colorado Leasing Company.—This company applied last week to the District Court for a writ restoring to them possession of the Dexter property, which is alleged to have been taken possession of forcibly by the Dexter company on August 2d.
graphic for visual presentation of text A hearing will be had by the court this week. The Colorado Leasing Company recently bought a mill at Florence and remodeled it for the purpose of treating ore from the Dexter by the cyanide process.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 26.09.2022 (06:28:28)
Above Info was First Seen 31.03.2011

Type/Category of Info:
General Mining News
Info Source From:
Mining Reporter. Volume: 52 [LII], Issue No. 16
Info Publication Date:
October 19, 1905
Info found on page:
404
Info Title:
Omaha Leasing Co. to Install Plant on Dexter Lease
Dexter—The Omaha Leasing Company is preparing for the installation of a larger hoisting plant on this shaft.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 03.03.2022 (20:23:49)
Above Info was First Seen 04.05.2010

Type/Category of Info:
General Mining News
Info Source From:
Mining Reporter. Volume: 53 [LIII], Issue No. 5
Info Publication Date:
February 1, 1906
Info found on page:
118
Info Title:
Dexter Happenings
Dexter.—The shaft house at this mine was destroyed by fire last week, but will be rebuilt immediately.
graphic for visual presentation of text A new shoot of ore was struck last week at a depth of 600 feet. Two carloads have been shipped and are expected to yield about $30 per ton.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 12.02.2023 (07:53:42)
Above Info was First Seen 31.05.2010

Type/Category of Info:
General Mining News
Info Source From:
Mining Reporter. Volume: 53 [LIII], Issue No. 22
Info Publication Date:
May 31, 1906
Info found on page:
546
Info Title:
Dexter Lessee Changes
Dexter.—Manager Little has given a lease on the company's main workings to Henry Dahl. Mr. Dahl succeeds the Stewart Leasing Company, which forfeited its lease after operating the property several months.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 20.02.2023 (09:31:22)
Above Info was First Seen 04.06.2010

Type/Category of Info:
General Mining News
Info Source From:
Mining Reporter. Volume: 54 [LIV], Issue No. 4
Info Publication Date:
July 26, 1906
Info found on page:
94
Info Title:
Dexter Lessees to Install Hoist
Dexter.—A hoist is to be installed on this Bull hill property by Lessees Dahl and Riley. The shaft will be sunk to a depth of 400 feet.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 23.02.2023 (12:00:11)
Above Info was First Seen 23.02.2023

Type/Category of Info:
General Mining News
Info Source From:
Mining Reporter. Volume: 54 [LIV], Issue No. 14
Info Publication Date:
October 4, 1906
Info found on page:
347
Info Title:
Dexter Reports Company Will Soon Commence Sinking
Dexter.—It is reported that the company will soon commence work on its own account, and sink its shaft to a depth of over 1,000 feet. Stations will be cut every 100 feet, but the management announces that no levels will be run until a depth of 1,600 feet has been reached.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 26.02.2023 (22:29:35)
Above Info was First Seen 26.02.2023

Type/Category of Info:
General Mining News
Info Source From:
Mining Reporter. Volume: 54 [LIV], Issue No. 20
Info Publication Date:
November 15, 1906
Info found on page:
502
Info Title:
Dexter to Sink
Dexter.—This company which operates on Bull Hill has purchased a ten drill compressor, 80-hp. boiler and accessory equipment. As soon as the machinery is installed, the company will commence to sink a shaft from the present 600-foot depth to 1,600 feet. No lateral work will be done other than cutting stations every 100 feet.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 28.02.2023 (09:46:15)
Above Info was First Seen 28.02.2023

Type/Category of Info:
General Mining News
Info Source From:
The Mining World. Volume: 28 [XXVIII], Issue No. 5
Info Publication Date:
February 1, 1908
Info found on page:
226
Info Title:
Dexter Lessees Western Leasing Co. Shipment
Cripple Creek—A carload of ore, which it is believed will net $45 a ton, has been shipped by the Western Leasing Co. from the Dexter on Bull hill. The ore was broken from a vein 18 ins. wide, recently encountered in the 500 level.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 16.12.2023 (09:10:10)
Above Info was First Seen 28.11.2010

Type/Category of Info:
General Mining News
Info Source From:
The Mining World. Volume: 28 [XXVIII], Issue No. 6
Info Publication Date:
February 8, 1908
Info found on page:
265
Info Title:
Dexter Lessees Burgdorf and Associates Working at 26 Feet
Cripple Creek—M. J. Burgdorf and associates, leasing on the Dexter property on Raven hill, made a small shipment of ore last week, and returns of $100 to the ton are expected.
graphic for visual presentation of text Ore is being broken from a fair sized vein at a depth of but 26 feet, and assay returns are showing picture values. The work of sinking on the vein is now in progress.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 17.12.2023 (08:41:22)
Above Info was First Seen 28.11.2010

Type/Category of Info:
General Mining News
Info Source From:
Mining and Scientific Press. Volume: 96 [XCVI], Issue No. 2491; 16
Info Publication Date:
April 18, 1908
Info found on page:
508
Info Title:
Dexter Leased
Another property that has recently been taken over by the Western Investment Co. is the Dexter, adjacent to the Last Dollar. The lease was taken since the first of April, but the company is already hoisting some ore.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 06.08.2023 (11:04:43)
Above Info was First Seen 06.08.2023

Type/Category of Info:
General Mining News
Info Source From:
Mining and Scientific Press. Volume: 97 [XCVII], Issue No. 2506; 5
Info Publication Date:
August 1, 1908
Info found on page:
139
Info Title:
Dexter Lessee Will Sink to 1000 Feet
L. W. Terril, who recently secured a lease on the Dexter property, on the west slope of Bull hill, will start active operations immediately.
graphic for visual presentation of text He will sink the shaft from the 600-ft. level to a depth of 1000 ft.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 12.08.2023 (08:59:19)
Above Info was First Seen 29.09.2010

Type/Category of Info:
General Mining News
Info Source From:
The Mining World. Volume: 29 [XXIX], Issue No. 5
Info Publication Date:
August 1, 1908
Info found on page:
178
Info Title:
Dexter Developing
Cripple Creek—A large amount of money is to be expended in developing the Dexter mine on Bull hill.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 30.12.2023 (08:45:41)
Above Info was First Seen 30.12.2023

Type/Category of Info:
General Mining News
Info Source From:
Mining Science. Volume: 60 [LX], Issue No. 1537
Info Publication Date:
July 15, 1909
Info found on page:
56
Info Title:
Dexter Leasers Ships Weekly Regularly
Leasers on the 700-ft. level of the Dexter are mining a fair grade of milling ore and are making regular weekly shipments.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 03.04.2022 (07:47:26)
Above Info was First Seen 20.06.2010

Type/Category of Info:
General Mining News
Info Source From:
Mining Science. Volume: 60 [LX], Issue No. 1552
Info Publication Date:
October 28, 1909
Info found on page:
403
Info Title:
Dexter with Important Discovery
An important discovery has been made on the Dexter, Bull hill, by lessees on the 800-ft. level. In carrying the crosscut to the main Dexter vertical vein a flat vein was unexpectedly encountered containing an ore body about 5 ft. thick, assaying from $12 to $13 a ton.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 12.04.2022 (23:08:09)
Above Info was First Seen 22.06.2010

Type/Category of Info:
General Mining News
Info Source From:
Mining and Scientific Press. Volume: 99 [XCIX], Issue No. 2571; 18
Info Publication Date:
October 30, 1909
Info found on page:
579
Info Title:
Dexter Sub-Lessees Open Vein at 800 Feet
Chas. Anderson and associates, operating the Dexter property on a sublease, have opened a flat vein on the 800-ft. level that assays from $12 to $30 per ton.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 28.04.2022 (12:15:38)
Above Info was First Seen 28.04.2022

Type/Category of Info:
General Mining News
Info Source From:
Mining Science. Volume: 64 [LXIV], Issue No. 1652
Info Publication Date:
September 28, 1911
Info found on page:
308
Info Title:
Dexter Shaft Sinking Begun
Work of sinking the Dexter shaft on Battle mountain has begun.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 02.06.2023 (07:51:18)
Above Info was First Seen 02.06.2023

Type/Category of Info:
General Mining News
Info Source From:
Mining Science. Volume: 64 [LXIV], Issue No. 1655
Info Publication Date:
October 19, 1911
Info found on page:
380
Info Title:
Dexter Shaft Sinking 5 Feet a Day

The Dexter shaft on BunkerBull hill, operated by the Anderson brothers of Victor, is being sunk at the rate of 5 ft. a day and is below the 900-ft. level.

Notes/Text been Edited:
Corrected location info
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 05.06.2023 (11:44:38)
Above Info was First Seen 05.06.2023

Type/Category of Info:
General Mining News
Info Source From:
Mining Science. Volume: 65 [LXV], Issue No. 1684
Info Publication Date:
May 2, 1912
Info found on page:
xxxiv
Info Title:
Dexter Shaft Shipping Again
The first shipments to be made from the Dexter mine on Bull hill since the shaft was put down to the 1,100 ft. mark some months ago have just been made.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 28.06.2023 (21:15:08)
Above Info was First Seen 14.07.2010

Type/Category of Info:
General Mining News
Info Source From:
The Mining and Scientific Press. Volume: 107 [CVII], Issue No. 9
Info Publication Date:
August 30, 1913
Info found on page:
357
Info Title:
Dexter Mine Lessees Opened Ore-Shoot
The new ore-shoot opened by lessees in the Dexter mine on Bull hill has been opened 50 ft. It averages 3 ft. in width and about $40 per ton, the yield being two cars per week.
Above Info was Last Updated on 30.10.2020 (11:04:30)
Above Info was First Seen 11.11.2019

Type/Category of Info:
General Mining News
Info Source From:
The Mining and Scientific Press. Volume: 107 [CVII], Issue No. 26
Info Publication Date:
December 27, 1913
Info found on page:
1030
Info Title:
Dexter Shaft Having Station Cut at 1200 Feet
The Dexter shaft on Bull hill is down 1217 ft., and a station is being cut at 1200 ft. Lessees are shipping ore regularly to the Golden Cycle mill.
Above Info was Last Updated on 30.10.2020 (11:04:30)
Above Info was First Seen 27.01.2020

Type/Category of Info:
General Mining News
Info Source From:
The Mining and Scientific Press. Volume: 119 [CXIX], Issue No. 3
Info Publication Date:
July 19, 1919
Info found on page:
101
Info Title:
Dexter Shaft Sinking
Contractors are sinking a shaft on the Dexter for the leasing firm of Anderson & Benkelman.
Above Info was Last Updated on 30.10.2020 (11:04:30)
Above Info was First Seen 07.03.2020

Type/Category of Info:
General Mining News
Info Source From:
The Mining and Scientific Press. Volume: 119 [CXIX], Issue No. 8
Info Publication Date:
August 23, 1919
Info found on page:
279
Info Title:
Dexter Connection to Trail
A 100-ft. lift in the Dexter shaft, under lease to Anderson and Benkelman, has been sunk in 18 days by C. G. Gorman and associate contractors. The Gorman interests will now cross-cut to the vein and oreshoot on the Trail mine of the United Gold Mining Co., on which Anderson and Benkelman hold a lease that expires this fall.
graphic for visual presentation of text It is confidently expected the cost of sinking the shaft and driving the cross-cut, timbering, and cutting the station will be taken out in addition to profits before the lease expires.
Above Info was Last Updated on 30.10.2020 (11:04:30)
Above Info was First Seen 08.03.2020

Type/Category of Info:
General Mining News
Info Source From:
The Mining and Scientific Press. Volume: 119 [CXIX], Issue No. 12
Info Publication Date:
September 20, 1919
Info found on page:
414
Info Title:
Trail Works
Gorman and associates, operating a sub-lease from Anderson and Benkelman on the Trail, are expected to make a good profit on the money expended in sinking the shaft an additional 100 ft. and cross-cutting to the vein.
graphic for visual presentation of text The work was performed in record time.
Above Info was Last Updated on 30.10.2020 (11:04:30)
Above Info was First Seen 08.03.2020

Type/Category of Info:
General Mining News
Info Source From:
The Mining and Scientific Press. Volume: 119 [CXIX], Issue No. 25
Info Publication Date:
December 20, 1919
Info found on page:
898
Info Title:
Trail & Dexter Lessees Rushes Work
The lease of Anderson and Benkelman on the Trail mine of the United Gold Mines Co. expires on January 1. Work is being rushed and in three days of the past week, shipments of ore netted the lessees $8000 after payment of transportation and treatment.
graphic for visual presentation of text The ore shipped was from the bottom or 1400-ft. level of the Dexter shaft, and averaged better than 3 oz. gold per ton. If no renewal is granted, the company will start work on high-grade ore.
Above Info was Last Updated on 30.10.2020 (11:04:30)
Above Info was First Seen 10.03.2020

Type/Category of Info:
General Mining News
Info Source From:
The Mining and Scientific Press. Volume: 119 [CXIX], Issue No. 26
Info Publication Date:
December 27, 1919
Info found on page:
932
Info Title:
Trail & Dexter Lessees with Record Producing Rate
With their lease expiring on December 31, Anderson and Benkelman, lessees operating the Trail mine, through the Dexter shaft, on the southern slope of Bull hill, are producing at a rate never before witnessed from a Cripple Creek lease.
graphic for visual presentation of text In 11 days in December, 18 cars of ore were shipped to the Golden Cycle mill at Colorado Springs, and settlement netted the lessees $24,965.
graphic for visual presentation of text The United Gold Mines Co. was paid in royalties $8788 and 1% was further deducted in taxes, making the total value of the 18 cars $34,500.
graphic for visual presentation of text The lease, it is understood, will not be extended and the property, controlled by A. E. Carlton, will be operated on company account. All of the interested parties in the lease have taken out fortunes and at a rough estimate the lease has cleared $1,000,000.
graphic for visual presentation of text The property adjoins the Cresson mine and the company for some months has been operating from the 1000-ft. level of the Cresson, and is reported to have opened good ore.
Above Info was Last Updated on 30.10.2020 (11:04:30)
Above Info was First Seen 10.03.2020

Type/Category of Info:
General Mining News
Info Source From:
The Mining and Scientific Press. Volume: 121 [CXXI], Issue No. 3
Info Publication Date:
July 17, 1920
Info found on page:
97
Info Title:
Dexter in Rich Ore on Trail
A new and rich ore-shoot has been opened on the 14th level of the Dexter mine on the south slope of Bull hill, on the Trail property of the United Gold Mines Co. by the leasing firm of Anderson & Benkelman.
graphic for visual presentation of text The vein, 4 to 5 ft. wide, is reported to carry rich ore. The extent of the shoot is not yet determined.
Above Info was Last Updated on 30.10.2020 (11:04:30)
Above Info was First Seen 29.02.2020