Detailed/More Info:
Independence Mill [aka Stratton's Independence Mill]
This is a hidden text,
acting just like a spacer
type of text in order to
push the Entity info
down on the page. Sorry to have wasted your time/ear to listen to this, I was just trying to get a layout work like I wanted.
Info Database Last Updated 08.04.2024 (Entity News entries: 136)
Type/Category of Info:
General Mining News
Info Source From:
The Mining and Scientific Press. Volume: 124 [CXXIV], Issue No. 11
Info Publication Date:
March 18, 1922
Info found on page:
379
Info Title:
Portland Independence Mill February Output
During February the tonnage treated at the Independence mill of the Portland company was increased to 23,100 of an average value of $3.50 per ton.
Notes/Text been Edited:
Abstracted and slightly rewritten from source text.
Above Info was Last Updated on 30.10.2020 (11:04:30)
Above Info was First Seen 12.02.2020

Type/Category of Info:
General Mining News
Info Source From:
The Mining and Scientific Press. Volume: 124 [CXXIV], Issue No. 6
Info Publication Date:
February 11, 1922
Info found on page:
202
Info Title:
Portland Independence Mill January Output
During January, the output of the Independence mill of the Portland Gold Mining Co. at Victor of what was heavy tonnage treated, was 32,800 tons of an average value of $3.45 per ton.
Notes/Text been Edited:
Abstracted from a somewhat larger source text about the whole district output
Above Info was Last Updated on 30.10.2020 (11:04:30)
Above Info was First Seen 11.02.2020

Type/Category of Info:
General Mining News
Info Source From:
The Mining and Scientific Press. Volume: 123 [CXXIII], Issue No. 25
Info Publication Date:
December 17, 1921
Info found on page:
866
Info Title:
Portland Independence Mill November Production
The November Production of the Portland company's Independence mill was 23,200 tons at $4.30 average, value $99,760
Notes/Text been Edited:
Abstracted and slightly rewritten from source text.
Above Info was Last Updated on 30.10.2020 (11:04:30)
Above Info was First Seen 20.02.2020

Type/Category of Info:
General Mining News
Info Source From:
The Mining and Scientific Press. Volume: 123 [CXXIII], Issue No. 23
Info Publication Date:
December 3, 1921
Info found on page:
794
Info Title:
Portland Doing Great
Increased tonnage is the order of the day at the Portland. The tonnage to the Independence mill has been increased 50% while the treatment cost has been lowered.
graphic for visual presentation of text Perry O. Harrison has succeeded G. M. Taylor as manager. Thomas B. Crowe, mill manager for many years, has resigned and left the service of the company.
Above Info was Last Updated on 30.10.2020 (11:04:30)
Above Info was First Seen 20.02.2020

Type/Category of Info:
General Mining News
Info Source From:
The Mining and Scientific Press. Volume: 123 [CXXIII], Issue No. 18
Info Publication Date:
October 29, 1921
Info found on page:
617
Info Title:
Portland Independende Mill Working Three Shifts
A third shift has been put to work at the Independence mill of the Portland Gold Mining Co., and the plant is now operating at capacity on lowgrade ores; company and custom ores are treated.
Above Info was Last Updated on 30.10.2020 (11:04:30)
Above Info was First Seen 18.02.2020

Type/Category of Info:
General Mining News
Info Source From:
The Mining and Scientific Press. Volume: 123 [CXXIII], Issue No. 17
Info Publication Date:
October 22, 1921
Info found on page:
582
Info Title:
Ajax Mine Shipping
The Ajax mine now has 25 sets of lessees operating, and daily shipments go to the Independence mill of the Portland company; higher-grade ore goes to the Golden Cycle mill at Colorado Springs.
Above Info was Last Updated on 30.10.2020 (11:04:30)
Above Info was First Seen 18.02.2020

Type/Category of Info:
General Mining News
Info Source From:
The Mining and Scientific Press. Volume: 123 [CXXIII], Issue No. 15
Info Publication Date:
October 8, 1921
Info found on page:
515
Info Title:
Ajax Shipments to Portland Independence Mill
The Ajax Mines Leasing Co. is now shipping steadily to the Independence mill of the Portland company near Victor.
Above Info was Last Updated on 30.10.2020 (11:04:30)
Above Info was First Seen 18.02.2020

Type/Category of Info:
General Mining News
Info Source From:
The Mining and Scientific Press. Volume: 123 [CXXIII], Issue No. 8
Info Publication Date:
August 20, 1921
Info found on page:
273
Info Title:
Cripple Creek July Production
July production of the Cripple Creek district as reported from the Golden Cycle, Portland, and Lincoln companies' mill totaled 39,592 tons with a gross value of $394,580.78.
Above Info was Last Updated on 30.10.2020 (11:04:30)
Above Info was First Seen 16.02.2020

Type/Category of Info:
General Mining News
Info Source From:
The Mining and Scientific Press. Volume: 123 [CXXIII], Issue No. 6
Info Publication Date:
August 6, 1921
Info found on page:
206
Info Title:
Old F. & C.C. Filling To Mill
A fill on the old Florence & Cripple Creek railroad (now dismantled), near Hollywood, made from waste from the Strong mine at Victor, in the days of high-grade production from that property, when all waste was hauled by the railroad free under the 'right-of-way' contract, is now being hauled to the Independence mill of the Portland Gold Mining Co., where it is netting around $10 and $12 per ton.
graphic for visual presentation of text Under a contract, $1 per ton was paid for the privilege of removing and shipping this rock.
Above Info was Last Updated on 30.10.2020 (11:04:30)
Above Info was First Seen 16.02.2020

Type/Category of Info:
General Mining News
Info Source From:
The Mining and Scientific Press. Volume: 123 [CXXIII], Issue No. 4
Info Publication Date:
July 23, 1921
Info found on page:
136
Info Title:
Portland Independence Mill June Output
The June output from the Portland G. M. Co.'s Independence mill, 13,181 tons, $4.20, total, $55,371.
Notes/Text been Edited:
Abstracted and slightly rewritten from source text.
Above Info was Last Updated on 30.10.2020 (11:04:30)
Above Info was First Seen 13.02.2020

Type/Category of Info:
General Mining News
Info Source From:
The Mining and Scientific Press. Volume: 122 [CXXII], Issue No. 25
Info Publication Date:
June 18, 1921
Info found on page:
854
Info Title:
Portland Independence Mill May Production
During May the Portland G. M. Co., Independence mill, treated 20,150 tons, of average $5.63 per ton, total $113,444.50
Notes/Text been Edited:
Abstracted and slightly rewritten from source text.
Above Info was Last Updated on 30.10.2020 (11:04:30)
Above Info was First Seen 23.02.2020

Type/Category of Info:
General Mining News
Info Source From:
The Mining and Scientific Press. Volume: 122 [CXXII], Issue No. 16
Info Publication Date:
April 16, 1921
Info found on page:
544
Info Title:
Portland Independence Mill March Production
During March the Independence mill, Cripple Creek, treated 20,306 tons of ore averaging $5.09.
Notes/Text been Edited:
Abstracted and slightly rewritten from source text.
Above Info was Last Updated on 30.10.2020 (11:04:30)
Above Info was First Seen 22.02.2020

Type/Category of Info:
General Mining News
Info Source From:
The Mining and Scientific Press. Volume: 122 [CXXII], Issue No. 14
Info Publication Date:
April 2, 1921
Info found on page:
470
Info Title:
Portland Independence Mill to Get Filled Stopes
The filled stopes in the Hidden Treasure section of the Portland are to be tapped and the ore conveyed by underground tram to the Independence, to be there hoisted for treatment at the Independence mill.
Notes/Text been Edited:
Abstracted and slightly rewritten from source text.
Above Info was Last Updated on 30.10.2020 (11:04:30)
Above Info was First Seen 22.02.2020

Type/Category of Info:
General Mining News
Info Source From:
The Mining and Scientific Press. Volume: 122 [CXXII], Issue No. 8
Info Publication Date:
February 19, 1921
Info found on page:
267
Info Title:
Portland Independence Mill January Production
The January output from the Portland G. M. Co.'s Independence mill was 17,556 tons of an average value of $5.56 per ton, bullion value $97,611.36
Notes/Text been Edited:
Abstracted and slightly rewritten from source text.
Above Info was Last Updated on 30.10.2020 (11:04:30)
Above Info was First Seen 21.02.2020

Type/Category of Info:
General Mining News
Info Source From:
The Mining and Scientific Press. Volume: 121 [CXXI], Issue No. 23
Info Publication Date:
December 4, 1920
Info found on page:
812
Info Title:
Portland Ships to Independence and Golden Cycle Mills
The Independence mill continues operating on low-grade ores, the higher grades being shipped to the Golden Cycle mill at Colorado Springs.
Above Info was Last Updated on 30.10.2020 (11:04:30)
Above Info was First Seen 02.03.2020

Type/Category of Info:
General Mining News
Info Source From:
The Mining and Scientific Press. Volume: 121 [CXXI], Issue No. 20
Info Publication Date:
November 13, 1920
Info found on page:
708
Info Title:
Portland Independence Mill October Output
During October the Portland company's Independence mill handled 18,556 tons of $3.70 grade.
Notes/Text been Edited:
Abstracted and slightly rewritten from source text.
Above Info was Last Updated on 30.10.2020 (11:04:30)
Above Info was First Seen 02.03.2020

Type/Category of Info:
General Mining News
Info Source From:
The Mining and Scientific Press. Volume: 121 [CXXI], Issue No. 12
Info Publication Date:
September 18, 1920
Info found on page:
424
Info Title:
Portland Independence Mill August Output
During August the Independence mill of the Portland Gold Mining Co, near Victor, handled 18,291 tons, valued at $62,104.
Notes/Text been Edited:
Abstracted and slightly rewritten from source text.
Above Info was Last Updated on 30.10.2020 (11:04:30)
Above Info was First Seen 01.03.2020

Type/Category of Info:
General Mining News
Info Source From:
The Mining and Scientific Press. Volume: 121 [CXXI], Issue No. 7
Info Publication Date:
August 14, 1920
Info found on page:
245
Info Title:
Portland Independence Mill July Output
The Independence mill of the Portland G. M. Co., at Victor treated 20,022 tons of ore averaging $3.10 during July.
Notes/Text been Edited:
Abstracted and slightly rewritten from source text.
Above Info was Last Updated on 30.10.2020 (11:04:30)
Above Info was First Seen 29.02.2020

Type/Category of Info:
General Mining News
Info Source From:
The Mining and Scientific Press. Volume: 121 [CXXI], Issue No. 3
Info Publication Date:
July 17, 1920
Info found on page:
97
Info Title:
Portland Independence Mill June Output
The Portland company's Independence mill at Victor treated 10,667 tons of an average value of $3.64, and the total bullion amounted to $71,765 during June from the Cripple Creek district.
Notes/Text been Edited:
Abstracted and slightly rewritten from source text.
Above Info was Last Updated on 30.10.2020 (11:04:30)
Above Info was First Seen 29.02.2020

Type/Category of Info:
General Mining News
Info Source From:
The Mining and Scientific Press. Volume: 121 [CXXI], Issue No. 1
Info Publication Date:
July 3, 1920
Info found on page:
23
Info Title:
Portland No. 1 Works Through Independence Mine & Mill
The ore in old stopes near the Portland No. 1 shaft on the south end of the property, is being hauled through the 7th level of the Independence, and 600 tons daily are delivered at the Independence mill.
graphic for visual presentation of text This ore will mill about $3 per ton.
Notes/Text been Edited:
Abstracted from source text.
Above Info was Last Updated on 30.10.2020 (11:04:30)
Above Info was First Seen 27.02.2020

Type/Category of Info:
General Mining News
Info Source From:
The Mining and Scientific Press. Volume: 120 [CXX], Issue No. 20
Info Publication Date:
May 15, 1920
Info found on page:
720
Info Title:
Independence Mill April Production
April Production from the Portland Independence mill at Victor was 15,000 tons at an average value of $3.86 per ton and gross value $60,000.
Notes/Text been Edited:
Abstracted and slightly rewritten from source text.
Above Info was Last Updated on 30.10.2020 (11:04:30)
Above Info was First Seen 26.02.2020

Type/Category of Info:
Abstracts of Official Reports
Info Source From:
The Mining and Scientific Press. Volume: 120 [CXX], Issue No. 14
Info Publication Date:
April 3, 1920
Info found on page:
511
Info Title:
Portland Gold Mining Co. Report
THE PORTLAND GOLD MINING CO.
graphic for visual presentation of textReport for the year ending December 31, 1919.
graphic for visual presentation of text
graphic for visual presentation of textProperty: Portland and Independence mines and the Independence mill in the Cripple Creek district, and the Portland Mill at Colorado Springs.
graphic for visual presentation of textOperating Officials: George M. Taylor, general manager; Fred Jones, mining engineer; Thomas B. Crowe and J. M. Tippett, metallurgical engineers.
graphic for visual presentation of textFinancial Statement: Gross value of ore mined and shipped, $1,272,720; proceeds from Independence mill, $513,877; miscellaneous revenue, $6293; cost of mining and milling, $1,502,600; net profit from operation, $230,290
graphic for visual presentation of textDividends: $240,000 during 1919; total to date, $11,497,080.
graphic for visual presentation of textDevelopment: The mines have been opened a depth of 2300 ft., where a station and pumping equipment has been completed. Good ore is being blocked out on the 20th and 21st levels.
graphic for visual presentation of textProduction: 373,192 tons of ore was produced during 1919.
Above Info was Last Updated on 30.10.2020 (11:04:30)
Above Info was First Seen 24.02.2020

Type/Category of Info:
General Mining News
Info Source From:
The Mining and Scientific Press. Volume: 120 [CXX], Issue No. 12
Info Publication Date:
March 20, 1920
Info found on page:
425
Info Title:
Portland Independence Mill February Output
During February the Portland Gold Mining Co.'s Independence mill, near Victor, treated 18,841 tons of ore with gold value of $2.07 per ton.
Notes/Text been Edited:
Abstracted and slightly rewritten from source text.
Above Info was Last Updated on 30.10.2020 (11:04:30)
Above Info was First Seen 24.02.2020

Type/Category of Info:
General Mining News
Info Source From:
The Mining and Scientific Press. Volume: 120 [CXX], Issue No. 5
Info Publication Date:
January 31, 1920
Info found on page:
163
Info Title:
Portland Independence Mill Ran Through 1919
The Portland Independence cyanidation-concentration mill at Victor was the only mill actively operated throughout 1919 in the Cripple Creek district.
Notes/Text been Edited:
Abstracted and slightly rewritten from source text; Statistical Review Production of Metal Mines for 1919 pages 163-166
Above Info was Last Updated on 30.10.2020 (11:04:30)
Above Info was First Seen 24.02.2020

Type/Category of Info:
General Mining News
Info Source From:
The Mining and Scientific Press. Volume: 119 [CXIX], Issue No. 21
Info Publication Date:
November 22, 1919
Info found on page:
760
Info Title:
Portland Independence Mine Not Affected by Lack of Coal
The Independence mill of the Portland company, treating low-grade mine and dump ores, is electrically operated and the tonnage treated will be normal.
Above Info was Last Updated on 30.10.2020 (11:04:30)
Above Info was First Seen 10.03.2020

Type/Category of Info:
General Mining News
Info Source From:
The Mining and Scientific Press. Volume: 119 [CXIX], Issue No. 20
Info Publication Date:
November 15, 1919
Info found on page:
718
Info Title:
Portland Independence Mill October Output
Portland G. M. Co.'s Independence mill, Victor, in October treated 27,321 tons, average grade $2.07 per ton, gross value $56,554.47
Notes/Text been Edited:
Abstracted and partly rewritten from source text.
Above Info was Last Updated on 30.10.2020 (11:04:30)
Above Info was First Seen 10.03.2020

Type/Category of Info:
General Mining News
Info Source From:
The Mining and Scientific Press. Volume: 119 [CXIX], Issue No. 16
Info Publication Date:
October 18, 1919
Info found on page:
572
Info Title:
Portland Independence Mill September Treatment
Of the tonnage treated during September the Independence mill of the Portland Gold Mining Co., near Victor, treated 25,810 tons with an average grade of $2.09 per ton.
Notes/Text been Edited:
Abstracted and partly rewritten from source text.
Above Info was Last Updated on 30.10.2020 (11:04:30)
Above Info was First Seen 09.03.2020

Type/Category of Info:
General Mining News
Info Source From:
The Mining and Scientific Press. Volume: 118 [CXVIII], Issue No. 25
Info Publication Date:
June 21, 1919
Info found on page:
859
Info Title:
Portland Mill Schedule Treatment Charges
The Portland company has announced a new schedule of treatment charges on low-grade mine and dump ores, as follows:
graphic for visual presentation of textUp to $3 value, $2.00 per ton
graphic for visual presentation of text $3.50 at $2.25 per ton
graphic for visual presentation of text $4 at $2.50 per ton
graphic for visual presentation of text $4.50 at $2.65 per ton
graphic for visual presentation of text $5 at $2.75 per ton.
Above Info was Last Updated on 30.10.2020 (11:04:30)
Above Info was First Seen 07.03.2020

Type/Category of Info:
General Mining News
Info Source From:
The Mining and Scientific Press. Volume: 118 [CXVIII], Issue No. 11
Info Publication Date:
March 15, 1919
Info found on page:
365
Info Title:
Portland Independence Mill February Output
The Portland Independence mill, Cripple Creek during February, a month where the weather, deep snow preventing movements of ore, both by team and by rail, still produced 37,000 tons with an average value of 2.06 for a total of $76,220.
Notes/Text been Edited:
Abstracted, restyled and rewritten from source text.
Above Info was Last Updated on 30.10.2020 (11:04:30)
Above Info was First Seen 04.03.2020

Type/Category of Info:
General Mining News
Info Source From:
The Mining and Scientific Press. Volume: 118 [CXVIII], Issue No. 7
Info Publication Date:
February 15, 1919
Info found on page:
225
Info Title:
Portland Independence Mill January Output
During January the Portland Independence mill treated 39,010 tons of $2.07 in average value, total $80,750.70
Notes/Text been Edited:
Abstracted and restructured/rewritten from source text.
Above Info was Last Updated on 30.10.2020 (11:04:30)
Above Info was First Seen 03.03.2020

Type/Category of Info:
Article
Info Source From:
The Mining Magazine. Volume: 12 [XII], Issue No. 6
Info Publication Date:
June 1915
Info found on page:
315
Info Title:
Stratton's Independence Limited News
Stratton's Independence Limited.
graphic for visual presentation of text The extraordinary general meeting of the shareholders held on May 17 was the occasion for bringing out a number of most interesting facts about the celebrated mine owned by this company. The story of the discovery, of the organization of the first Stratton's Independence Limited, of the over estimates, high prices of shares, and the disaster that followed is already familiar.
graphic for visual presentation of text In 1908, the lower levels had been fruitlessly explored and the upper levels were inaccessible because of a cave. A mill had been built to treat the accumulated dump ores, but the company was in debt locally to the amount of £25,000 and there was no working capital. Heroic measures were adopted.
graphic for visual presentation of text The company was reconstructed on a basis of £125,000 capital in 1,000,000 shares of 2s. 6d. each in place of £1,100,000 in £1 shares.
graphic for visual presentation of text The old shares were exchanged for new on a basis of 1s. 6d. paid, and thus cash to pay the debts and supply working capital was secured. Many of the shareholders had paid high prices for their shares, and the old company died with an unenviable record of failure.
graphic for visual presentation of text The mine, however, was good. To date it has produced gold to a value of £4,850,000 or $23,573,500. Of this, W. S. Stratton won before sale of the property $3,985,440, the first company produced $15,064,320, and the second or present company $4,523,740.
graphic for visual presentation of text The old company paid in dividends $4,748,989, while since its organization the new Stratton's has distributed 1s. 10½d. per share to which was added 6d. at the meeting. Thus, it has paid 2s. 4,5d., nearly the par value of its shares, and has in reserve as a result of the action then take an sum equal to 1s. 3d. per share.
graphic for visual presentation of text On its merits as well as by contrast, these results redound greatly to the credit of the managers and the engineers in charge. The whole story indeed is a brilliant one of saving the maximum from a wreck.
graphic for visual presentation of text The total dividends paid by the two companies is materially above the net value of the mine, $5,000,000, as fixed by the examination made when British capital first went into the enterprise.
graphic for visual presentation of text When the new company was formed, Mr. Philip Argall estimated a profit of $1 per ton when working at the rate of 10,000 tons per month on $3.60 ore. The profit has been substantially that amount despite the fact that the sampling of the dump by the engineers of the old company proved inexact, the ore averaging $3 instead of $3.60. Mr. Argall has been able to reduce costs and increase extraction enough to compensate.
graphic for visual presentation of text On the whole, the company has been fortunate in the amount of ore found in the upper levels, £65,000 having been won from the 'mill veins.' A good mine dies hard, but it dies.
graphic for visual presentation of text Mr. Argall has kept his company fully informed as to the exhaustion of both mine and dumps, and the time has come when the work must be stopped.
graphic for visual presentation of text Negotiations for purchase of other dumps, in particular those of the Portland Gold Mining Company, proved fruitless, but they did result in an offer from the Portland company to purchase the mine and mill upon what are, we believe, excellent terms for all concerned.
graphic for visual presentation of text Briefly, the Portland is to pay £65,000 plus the invoice of supplies, and Stratton's Independence is to keep the property till the end of June. Since a surplus of £20,000 has been accumulated, the close of these various transactions will leave the company with nearly £96,000 on hand. This we believe to be very good business.
graphic for visual presentation of text Anyone familiar with the local situation will recognize that the Portland with its big dumps right at hand can pay a larger price for the Stratton's mill than could any other company. It is also true, owing to the relations of the two mines, that the Portland management can win whatever ore may still remain in the property at less cost than it could be mined by Stratton's working independently.
graphic for visual presentation of text The bargain is, we repeat, one of the satisfactory kind where each party to it takes a profit. We are confident that under the management of Mr. G. M. Taylor, the Portland will derive full benefit from the purchase, while the excellent record of service Mr. Argall has with Stratton's is the best guarantee that the fund now available will be wisely invested if the programme of purchasing another mine be followed.
graphic for visual presentation of text A small number of the shareholders at the meeting expressed a strong preference for dividing the whole sum remaining rather than making any new venture, however promising, at this time, but the vote was heavily in favour of the plan outlined by the directors.
graphic for visual presentation of text Mr. Argall stated to the meeting that, while his firm had four different properties under study, he was not prepared at this time to recommend a purchase. It was therefore left that until a satisfactory property was offered, matters are to stand as they are, and if no suitable investment be found within a reasonable time, the chairman agreed to recommend dissolution of the company.
graphic for visual presentation of text The policy or unpolicy of such reinvestment, made by a company as a whole in place of individually by shareholders, is too broad to discuss at this time. We may, however, congratulate the present shareholders of Stratton's on having received in dividends a sum substantially equal to the par value of their shares and having a sum in the treasury of the company adequate to undertaking a wholly new mining enterprise.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 10.10.2021 (18:51:24)
Above Info was First Seen 05.05.2021

Type/Category of Info:
Abstracts of Official Reports
Info Source From:
The Mining Magazine. Volume: 11 [XI], Issue No. 6
Info Publication Date:
December 1914
Info found on page:
394
Info Title:
Stratton's Independence Report
We have on many occasions referred to the history of the Independence gold mine at Cripple Creek, Colorado, and need not recapitulate here. During the last few years, operations have been confined to re-treating the tailing dumps according to a method devised by Philip Argall, and the removal from the workings of any remaining high-grade ore by the company and by tributers.
graphic for visual presentation of textThe report for the year ended June 30 last shows that 3899 tons of ore was shipped to smelters on the company's account and 7783 tons on the lessee's account, realizing £14,173 and £33,114 respectively gross, or £9651 and £22,782 net after payment of treatment expenses and freight.
graphic for visual presentation of textThe royalty accruing to the company on the lessees' ore was £7280. At the mill and cyanide plant, 45,683 tons of low-grade ore from the mine and 88,192 tons of dump tailing were treated, yielding 7654 oz. gold in concentrate, which was shipped to smelters, and 7764 oz. in bullion, making a total extraction of 15,418 oz. or 2.3 dwt. per ton.
graphic for visual presentation of textThe profit on milling and cyaniding was £20,995. After all expenses were paid, a profit of £19,136 remained, out of which £6500 has been distributed as dividend, being at the rate of 5%.
graphic for visual presentation of textIt is expected that the mine will continue to yield shipping ore, but on a smaller scale, and that low-grade ore and dump material will keep the treatment-plant occupied for two years.
graphic for visual presentation of textNegotiations were in hand before the war for the acquisition of a new property, but all efforts in this direction are now suspended.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 10.10.2021 (18:51:24)
Above Info was First Seen 16.05.2021

Type/Category of Info:
Article
Info Source From:
Metallurgical and Chemical Engineering. Volume: 12 [XII], Issue No. 10
Info Publication Date:
October 1914
Info found on page:
635
Info Title:
Stratton's Independence, Ltd. June 1914 Numbers
Stratton's Independence, Ltd., at Cripple Creek, produced 1176 tons of mine ore averaging about $16 per ton, and the mill treated 11,700 tons of low-grade mine and dump ore, during the month of June. The net working profit to the company from both mine and mill operations was $14,420.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 09.02.2023 (09:42:20)
Above Info was First Seen 09.02.2023

Type/Category of Info:
General Mining News
Info Source From:
Metallurgical and Chemical Engineering. Volume: 12 [XII], Issue No. 8
Info Publication Date:
August 1914
Info found on page:
542
Info Title:
Stratton's Independence, Ltd. May 1914 Numbers
Stratton's Independence, Ltd., Cripple Creek, Col., milled 11,800 tons of low-grade mine and dump ore in the month of May, 1914, yielded a net working profit to the company from both mine and mill departments of $10,150.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 09.02.2023 (09:42:11)
Above Info was First Seen 09.02.2023

Type/Category of Info:
General Mining News
Info Source From:
The Mining and Scientific Press. Volume: 107 [CVII], Issue No. 23
Info Publication Date:
December 6, 1913
Info found on page:
907
Info Title:
Independence Mill Production; November 1913
The Estimated production of the following district mill during November is as follows:
graphic for visual presentation of text
graphic for visual presentation of textWhere treated
graphic for visual presentation of textTons
graphic for visual presentation of textAv. value
graphic for visual presentation of textGross value
graphic for visual presentation of textStratton's Independence
graphic for visual presentation of text10,107
graphic for visual presentation of text$ 2.92
graphic for visual presentation of text$ 29,512
graphic for visual presentation of text
Notes/Text been Edited:
Abstracted and somewhat rewritten slightly
Above Info was Last Updated on 30.10.2020 (11:04:30)
Above Info was First Seen 26.01.2020

Type/Category of Info:
Abstracts of Official Reports
Info Source From:
The Mining Magazine. Volume: 9 [IX], Issue No. 6
Info Publication Date:
December 1913
Info found on page:
464
Info Title:
Stratton's Independence Report
It is not necessary here to recapitulate the history of this famous gold mine at Cripple Creek. Colorado. Suffice it to say that, of late years, operations have been confined to re-treatment the dump by the method devised by Philip Argall and by the removal of any remaining ore of high grade, by the company and by tributors. The report for the year ended June 30 last shows that the likelihood of finding rich ore is decreasing and that the profits will not be maintained.
graphic for visual presentation of textDuring the period under review, 5296 ton of ore was mined by the company, and sold to the smelters for £19,943 gross, or £13,851 net after payment for freight and treatment; 10,313 tons was mined by the lessees, and sold for £47,325 gross or £33,661 net.
graphic for visual presentation of textThe royalty accruing to the company from the tributors' ore was £11,103.
graphic for visual presentation of textAt the low-grade plant, 104,111 tons of dump material and 25,999 tons of mine ore was treated yielding 15,707 oz. gold, of which 6891 oz. was recovered in concentrate, and 8816 oz. in bullion.
graphic for visual presentation of textThe operating profit at the mill was £26,989, of which £3254 was credited to the mine for low-grade ore treated.
graphic for visual presentation of textThe general expenses at the mine were £11,659, including £4755 for development, and £6703 administration expenses.
graphic for visual presentation of textLondon expenses absorbed £2150, settlement of the Portland company's claim £2062, settlement of the Moore Filter company's claim £859, income tax £717, and £1752 was allowed for depreciation.
graphic for visual presentation of textThe net profit for the year was £17,777, which added to the balance brought forward made a total disposable amount of £29,680.
graphic for visual presentation of textOut of this, £25,000 has been distributed as dividend, being at the rate of 6d. per 2s. 6d. share.
graphic for visual presentation of text As usual the report contains a full statement of operations written by the consulting engineers and managers, Philip Argall & Sons.
graphic for visual presentation of text We published an article by Philip Argall on the present scheme of operations in our issue of November 1911.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 10.10.2021 (18:51:24)
Above Info was First Seen 16.05.2021

Type/Category of Info:
Article
Info Source From:
The Mining and Scientific Press. Volume: 107 [CVII], Issue No. 20
Info Publication Date:
November 15, 1913
Info found on page:
760
Info Title:
Lead Salts in Cyanidation; Stratton's Independence Mill
Stratton's Independence
graphic for visual presentation of text The experience with lead acetate at Stratton's Independence mill, at Cripple Creek, has been confined to its use in forming the zinc-lead couple in the zincboxes.
graphic for visual presentation of text The zinc is cut by hand and dipped in a 3 to 5% solution of lead acetate before using. In the earlier experiments on Cripple Creek sulpho-tellurides the use of lead acetate as added to agitation tests on slime gave rather negative results, and it has not been used in the actual ore treatment since.
Notes/Text been Edited:
Abstracted from a source text over several pages, named; Lead Salts in Cyanidation.
Above Info was Last Updated on 30.10.2020 (11:04:30)
Above Info was First Seen 02.12.2019

Type/Category of Info:
General Mining News
Info Source From:
The Mining and Scientific Press. Volume: 107 [CVII], Issue No. 15
Info Publication Date:
October 11, 1913
Info found on page:
589
Info Title:
Independence Mill Production; September 1913
The reported production of the following district mill during September was as follows:
graphic for visual presentation of text
graphic for visual presentation of textPlants
graphic for visual presentation of textTonnage
graphic for visual presentation of textAv. val.
graphic for visual presentation of textGross val.
graphic for visual presentation of textStratton's Independence
graphic for visual presentation of text11,375
graphic for visual presentation of text2.67
graphic for visual presentation of text$ 30,271
Notes/Text been Edited:
Abstracted and somewhat rewritten slightly
Above Info was Last Updated on 30.10.2020 (11:04:30)
Above Info was First Seen 18.11.2019

Type/Category of Info:
General Mining News
Info Source From:
The Mining and Scientific Press. Volume: 107 [CVII], Issue No. 10
Info Publication Date:
September 6, 1913
Info found on page:
392
Info Title:
Independence Mill Production; August 1913
According to local statistics, the following Cripple Creek mill August output was:
graphic for visual presentation of text
graphic for visual presentation of textPlants
graphic for visual presentation of textOre treated tons
graphic for visual presentation of textAv. val. per ton
graphic for visual presentation of textGross val.
graphic for visual presentation of textStratton's Independence
graphic for visual presentation of text11,286
graphic for visual presentation of text$ 2.67
graphic for visual presentation of text$ 30,133
graphic for visual presentation of text
Notes/Text been Edited:
Abstracted and somewhat rewritten slightly
Above Info was Last Updated on 30.10.2020 (11:04:30)
Above Info was First Seen 11.11.2019

Type/Category of Info:
General Mining News
Info Source From:
The Mining and Scientific Press. Volume: 107 [CVII], Issue No. 9
Info Publication Date:
August 30, 1913
Info found on page:
357
Info Title:
Cripple Creek Local Mill Production
During July, eight of the local mills, the Portland, Stratton's Independence, Colburn-Ajax, Kavanagh-Jo Dandy, Gaylord-Dante, Rex Mining & Milling Co., Wild Horse, and Isabella plants, treated 35,373 tons of ore with a gross value of $85,428.
graphic for visual presentation of text This low-grade ore ranged in value from $1.10 to $2.84 per ton, with a general average value of $2.41 per ton.
Notes/Text been Edited:
Abstracted from a somewhat longer source text talking about several local mills.
Above Info was Last Updated on 30.10.2020 (11:04:30)
Above Info was First Seen 11.11.2019

Type/Category of Info:
General Mining News
Info Source From:
The Mining and Scientific Press. Volume: 107 [CVII], Issue No. 6
Info Publication Date:
August 9, 1913
Info found on page:
241
Info Title:
Independence Mill Production; July 1913
According to local statistics, the following Cripple Creek mill July output was:
graphic for visual presentation of text
graphic for visual presentation of textPlant
graphic for visual presentation of textTons
graphic for visual presentation of textAv. val.
graphic for visual presentation of textGross value.
graphic for visual presentation of textStratton's Independence
graphic for visual presentation of text11,073
graphic for visual presentation of text2.23
graphic for visual presentation of text24,693
Notes/Text been Edited:
Abstracted and somewhat rewritten slightly
Above Info was Last Updated on 30.10.2020 (11:04:30)
Above Info was First Seen 23.10.2019

Type/Category of Info:
General Mining News
Info Source From:
The Mining and Scientific Press. Volume: 107 [CVII], Issue No. 2
Info Publication Date:
July 12, 1913
Info found on page:
72
Info Title:
Independence Mill Production; June 1913
According to local statistics, the following Cripple Creek mill gold production was:
graphic for visual presentation of text
graphic for visual presentation of textName
graphic for visual presentation of textTons.
graphic for visual presentation of textAv. val.
graphic for visual presentation of textGross value.
graphic for visual presentation of textStratton's Independence
graphic for visual presentation of text11,800
graphic for visual presentation of text2.36
graphic for visual presentation of text27,848
graphic for visual presentation of text
Notes/Text been Edited:
Abstracted and somewhat rewritten slightly
Above Info was Last Updated on 30.10.2020 (11:04:30)
Above Info was First Seen 21.10.2019

Type/Category of Info:
General Mining News
Info Source From:
The Mining Magazine. Volume: 8 [VIII], Issue No. 5
Info Publication Date:
May 1913
Info found on page:
319
Info Title:
Stratton's Independence Still Working Profitably
Stratton's Independence, thanks to Mr. Philip Argall, continues to make steady returns. Out of $2.80 dump ore, a profit of $1 is being squeezed; and even $3 ore is being mined and milled profitably. A new shallow adit has been extended from the floor of the old ore house to the Portland boundary, with crosscuts under old surface workings, opening up at least 150,000 tons of remnants that can be extracted profitably.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 10.10.2021 (18:51:24)
Above Info was First Seen 16.05.2021

Type/Category of Info:
General Mining News
Info Source From:
Mining Science. Volume: 66 [LXVI], Issue No. 1716
Info Publication Date:
December 12, 1912
Info found on page:
xxv
Info Title:
Stratton's Independence Mill Estimated Treated 320,000 Tons
It has been estimated that since the Stratton's Independence mill was started up, which was in April of 1908, there have been in the neighborhood of 320,000 tons of ore shoveled from the dump and treated in the mill.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 11.07.2023 (11:04:50)
Above Info was First Seen 11.07.2023

Type/Category of Info:
General Mining News
Info Source From:
Mining Science. Volume: 66 [LXVI], Issue No. 1714
Info Publication Date:
November 28, 1912
Info found on page:
xxv
Info Title:
Stratton's Independence Mine & Mill Numbers
The production of Stratton's Independence mine has now reached $21,820,562. The total gross production of mine and mill for the fiscal year amounted to $758,977.34. The earnings reached $174,511.38, of which $ 89,066 came from the mill.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 10.07.2023 (00:06:25)
Above Info was First Seen 09.07.2023

Type/Category of Info:
Editorial Leader
Info Source From:
The Mining Magazine. Volume: 7 [VII], Issue No. 5
Info Publication Date:
November 1912
Info found on page:
325
Info Title:
Stratton's Independence Mine & Mill Numbers
THE ANNUAL MEETING of Stratton's Independence focuses attention again on the admirable management of that property, affording a gratifying contrast with the boom days, when everything was subordinated to market requirements.
graphic for visual presentation of textDuring the past financial year the output was worth $758,977, bringing the total gross production of this famous mine to $21,820,562.
graphic for visual presentation of textThe mine did exceptionally well last year by reason of the yield of high-grade ore from the newly discovered Mill veins, which are now almost exhausted.
graphic for visual presentation of text In 1911 we published a description of the milling methods at Stratton's Independence from the pen of Mr. Philip Argall, the actual cost of milling confirming with exactitude the original estimate on a new method of ore treatment.
graphic for visual presentation of text The figures given by Mr. Argall covered only the last three months of the financial year ending June 30, 1911, during which months the mill for the first time attained a capacity of 10,000 tons per month. This capacity is easily maintained, but through stress of weather the mill was idle about one month last winter, which reduced the average tonnage treated to 9366 per month.
graphic for visual presentation of text Nevertheless the original estimate of $1.52 based on milling 10,000 tons per month was not exceeded, as shown below :
graphic for visual presentation of text
graphic for visual presentation of textEstimate
graphic for visual presentation of textof 1907
graphic for visual presentation of textFirst 3 months at full capacity
graphic for visual presentation of textYear ended
graphic for visual presentation of textJune 30, 1912
graphic for visual presentation of textDump loading
graphic for visual presentation of text$ 0.10
graphic for visual presentation of text$ 0.0891
graphic for visual presentation of text$ 0.095
graphic for visual presentation of textMilling cost
graphic for visual presentation of text1.24
graphic for visual presentation of text1.2390
graphic for visual presentation of text1.271
graphic for visual presentation of textTreating concentrate
graphic for visual presentation of text0.18
graphic for visual presentation of text0.172
graphic for visual presentation of text0.137
graphic for visual presentation of text
graphic for visual presentation of text——————
graphic for visual presentation of text——————
graphic for visual presentation of text——————
graphic for visual presentation of textTotal cost
graphic for visual presentation of text$ 1.52
graphic for visual presentation of text$ 1.5001
graphic for visual presentation of text$ 1.503
graphic for visual presentation of text
graphic for visual presentation of text During the year 112,391 tons of ore was milled, assaying only $3.10 per ton, for a profit of $89,066. The extraction was as follows :
graphic for visual presentation of text
graphic for visual presentation of text1911 %
graphic for visual presentation of text1912 %
graphic for visual presentation of textIn concentrate
graphic for visual presentation of text43.65
graphic for visual presentation of text42.19
graphic for visual presentation of textIn bullion
graphic for visual presentation of text27.85
graphic for visual presentation of text31.44
graphic for visual presentation of text
graphic for visual presentation of text——————
graphic for visual presentation of text——————
graphic for visual presentation of textTotal extraction
graphic for visual presentation of text71.50
graphic for visual presentation of text73.63
graphic for visual presentation of text
graphic for visual presentation of text This record speaks for itself, but we are glad to add to it our hearty appreciation of the excellent technical and administrative work done by Mr. Argall.
graphic for visual presentation of text The old mine is nearly exhausted and it is but gleanings that are now being garnered, as compared with the prolific production of an earlier period, yet it is fair to say that the story of this British financial excursion into Colorado has been greatly redeemed in the last chapter.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 10.10.2021 (18:51:24)
Above Info was First Seen 15.05.2021

Type/Category of Info:
Abstracts of Official Reports
Info Source From:
The Mining Magazine. Volume: 7 [VII], Issue No. 5
Info Publication Date:
November 1912
Info found on page:
388
Info Title:
Stratton's Independence Report
The report of this company operating the gold mine at Cripple Creek, Colorado, for the year ended June 30, shows that both the mine and the dump continue to yield profits. It is not necessary to recapitulate the history of this mine, as we have given it on previous occasions.
graphic for visual presentation of text Of late years, operations have been confined to re-treating the dump by the method described by the manager, Philip Argall, in our issue of November, 1911, and to the working of parts of the mine by the company and by tributers. In 1908 the capital was written down by reducing the shares from £1 to 2s. 6d, and stands at £125,000.
graphic for visual presentation of text The report now issued shows that the output of ore by tributers was not as great as during the previous year, but that the ore produced by the developments conducted on behalf of the company showed a substantial increase. In all probability the production by tributers will still further decline, and the yield of low-grade ore on company account will increase.
graphic for visual presentation of textThe new vein system, called the 'mill veins,' discovered a year ago, promises to lengthen the life of the company.
graphic for visual presentation of textThe output of ore from the Independence mine was 10,455 tons produced by the tributers, containing gold worth $304,464, and 4550 tons produced by the company, having a content of $116, 518; in addition 1922 tons containing gold worth $48,599, was taken by tributers from the Washington claim, and 1567 tons from the dump containing $35,735, also by tributers.
graphic for visual presentation of textThe net returns from the sale of the ore amounted to $377,480, of which $87,156 was received by the company from its own ore, and $108,752 from royalties.
graphic for visual presentation of textThe company also won 13,019 tons of ore which was treated by the company's plant, containing $67,887, and yielding a profit of $20,784.
graphic for visual presentation of textAt the company's treatment plant, 99,372 tons of dump-ore as well as the 13,019 tons of mine-ore was treated, yielding 18,833 oz. gold.
graphic for visual presentation of textThe profit at the plant was £13,778, the net proceeds from sale of ore on company's account £17,970, and the company's royalty on tributers production was £22,432.
graphic for visual presentation of textThe cost at the mine was £14,122, administration expenses were £6954, London expenses £2209, and allowance for depreciation £3505, leaving a profit of £27,465, out of which £25.000 has been distributed as dividend, being at the rate of 20 per cent.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 10.10.2021 (18:51:24)
Above Info was First Seen 16.05.2021

Type/Category of Info:
General Mining News
Info Source From:
Mining Science. Volume: 66 [LXVI], Issue No. 1700
Info Publication Date:
August 22, 1912
Info found on page:
xxvii
Info Title:
Stratton's Independence Big Dump Eaten by Electric Shovel
The electric shovel used in tearing down the dump at the Stratton's Independence has taken away the big dump from the mill down to the Florence & Cripple Creek tracks. It has taken down over 300,000 tons of ore in the last three years.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 06.07.2023 (08:52:24)
Above Info was First Seen 06.07.2023

Type/Category of Info:
General Mining News
Info Source From:
Mining Science. Volume: 65 [LXV], Issue No. 1685
Info Publication Date:
May 9, 1912
Info found on page:
xxxiv
Info Title:
Stratton's Independence Mill Treats About 10,000 Tons Monthly
The Stratton's Independence mill is now treating in the neighborhood of 10,000 tons a month and the average value of the ore is $3 a ton.
graphic for visual presentation of text Mr. Argall is contemplating the addition of two agitating tanks to the mill.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 29.06.2023 (15:02:16)
Above Info was First Seen 14.07.2010

Type/Category of Info:
Special/Editorial Correspondence
Info Source From:
The Mining Magazine. Volume: 6 [VI], Issue No. 1
Info Publication Date:
January 1912
Info found on page:
32
Info Title:
Stratton's Independence Mill Takes Low-Grade Ore
Much of the low-grade ore is now being treated by mills at the mines, like at the Stratton's Independence which is taking 10,000 tons of $2.75 ore.
Notes/Text been Edited:
Abstracted and partly rewritten from source text.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 10.10.2021 (18:51:24)
Above Info was First Seen 15.05.2021

Type/Category of Info:
Special/Editorial Correspondence
Info Source From:
The Engineering and Mining Journal. Volume: 92 [XCII], Issue No. 27
Info Publication Date:
December 30, 1911
Info found on page:
1291
Info Title:
Stratton's Independence Mill Closed for Lack of Water
Denver Dec. 22—The drainage tunnel after all has not been an unmixed blessing to the mines of the Cripple Creek district, for Stratton's Independence has had to close down its mill for want of water.
graphic for visual presentation of text Wilson Creek, which was largely supplied by the discharge of water pumped from the mines, is bone dry, and so are some springs from which Stratton's got its supply, and the drainage tunnel, combined with the zero weather, has completed the drought.
graphic for visual presentation of text The average recession of water, according to Engineer Countryman, is now 10 ft. per month in all the deep shafts.
Notes/Text been Edited:
Abstract from a larger text dealing for several themes/places around Colorado
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 30.10.2020 (11:04:30)
Above Info was First Seen 31.03.2019

Type/Category of Info:
Special/Editorial Correspondence
Info Source From:
The Engineering and Mining Journal. Volume: 92 [XCII], Issue No. 25
Info Publication Date:
December 16, 1911
Info found on page:
1195
Info Title:
Independence Mill, aka the Argall Mill, Tonnage Treated
Denver Dec. 9—The Argall mill, of Stratton's, reports its usual 10,300 tons treated.
Notes/Text been Edited:
Abstracted from a somewhat longer text, tiny bit rewritten..
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 30.10.2020 (11:04:30)
Above Info was First Seen 30.03.2019

Type/Category of Info:
Article
Info Source From:
The Engineering and Mining Journal. Volume: 92 [XCII], Issue No. 23
Info Publication Date:
December 2, 1911
Info found on page:
1080
Info Title:
Stratton's Independence, Ltd. Latest Report Regarding the Mill
The report of Stratton's Independence, Ltd., for the year ended June 30, 1911, shows that the net profit for the year was £21,000, of which sum £12,500 were paid out as a dividend. Development work to the extent of 9186 ft. was done in the mine, of which 19 per cent, was in the form of crosscutting.
graphic for visual presentation of text In addition to ore of shipping grade the company for the first time produced low-grade milling ore amounting to 7440 tons. The greater part of this was sorted out of the ore rejected by the lessees and sent direct to the mine breaker, while the waste went back into the mine for filling. Formerly both products, the low-grade milling ore and the waste, went to build up the ore-house dump. Now everything that passes through the ore house is worked up daily and finally disposed of. The total production of the mine was 25,825 tons, having a gross value of $534,068 and a value of $389,008, after deducting freight and treatment charges.
graphic for visual presentation of text
graphic for visual presentation of text The mine breaker and roll mill began operations in October, 1910, and averaged about 825 tons per month during the nine months of the fiscal year in which the plant was in operation.
graphic for visual presentation of text In addition to the changes required to combine the wet mill with the mine breaker and roll mill, the permanent breaker plant of 70 tons per hour capacity was erected in the clearing made in the heart of the dump by previous milling operations.
graphic for visual presentation of text
graphic for visual presentation of text The fourth Chilean mill was erected as a reserve, and six more slime tables added, together with new distributers and a new settling tank in the cyanide department. These additions brought up the milling capacity from 7500 tons per month to 10,000 per month, an increase of 33 per cent. The sum of £13,900 was charged to mill construction during the year. The 109,800 tons of ore milled during the year averaged 0.157 oz. per ton. The total recovery was 71.5 per cent.; 43.65 per cent, by concentration and 27.85 per cent, by cyaniding.
graphic for visual presentation of text The total milling cost is given as $1.52 per ton, which agrees closely with Philip Argall's estimate made in 1907 as to the probable cost on a basis of 10,000 tons per month with 70 per cent, extraction.
Notes/Text been Edited:
Abstracted from an article about the latest Stratton's Independence, Ltd. Report.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 30.10.2020 (11:04:30)
Above Info was First Seen 29.03.2019

Type/Category of Info:
Editorial Leader
Info Source From:
The Mining Magazine. Volume: 5 [V], Issue No. 6
Info Publication Date:
December 1911
Info found on page:
409
Info Title:
Stratton's Independence Cyanide Mill Up-To-Date
THE BATTLE of the processes has been nowhere waged more vigorously than in Colorado, where chlorination and cyanidation have competed with varying success during two decades for preference in the treatment of the ores of Cripple Creek.
graphic for visual presentation of text Cyanidation is the victor, for it has been apparent for several years that the application of tube-milling and cyanidation to the tailing from the chlorination plants had placed these in a humiliating position. The successful plant at Stratton's Independence is, of course, the most up-to-date exponent of the cyanide process.
Notes/Text been Edited:
Abstracted and partly rewritten from source text.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 10.10.2021 (18:51:24)
Above Info was First Seen 15.05.2021

Type/Category of Info:
Article
Info Source From:
Mining Science. Volume: 64 [LXIV], Issue No. 1647
Info Publication Date:
August 24, 1911
Info found on page:
177
Info Title:
Stratton's Independence Mill July 1911 Output
During July the Stratton’s Independence plant processed 10,145 tons with an average value of $3.12 and a bullion value of $31,642.40.
Notes/Text been Edited:
Abstracted from source text in table and restyled/written to sentence form.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 26.05.2023 (08:33:23)
Above Info was First Seen 26.05.2023

Type/Category of Info:
Personals
Info Source From:
The Engineering and Mining Journal. Volume: 92 [XCII], Issue No. 8
Info Publication Date:
August 19, 1911
Info found on page:
370
Info Title:
Herbert Whitaker Quits at Stratton's Independence Ltd.
Herbert Whitaker has resigned as cyanide superintendent at Stratton's Independence, Ltd., Victor, Colo., to accept a similar position at the Arizona Mascot mine, Crown King, Arizona.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 30.10.2020 (11:04:30)
Above Info was First Seen 26.03.2019

Type/Category of Info:
Article
Info Source From:
Mining Science. Volume: 64 [LXIV], Issue No. 1641
Info Publication Date:
July 13, 1911
Info found on page:
35
Info Title:
Stratton's Independence Mill June 1911 Output
During June the Stratton's Independence plant processed 10,500 tons with an average value of $2.74 and a bullion value of $28,770.
Notes/Text been Edited:
Abstracted from source text in table and restyled/written to sentence form.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 22.05.2023 (08:27:00)
Above Info was First Seen 22.05.2023

Type/Category of Info:
General Mining News
Info Source From:
Mining Science. Volume: 63 [LXIII], Issue No. 1637
Info Publication Date:
June 15, 1911
Info found on page:
624
Info Title:
Stratton's Independence Mill May 1911 Output
During May the Stratton's Independence plant processed 10,040 tons with an average value of $3.35 and a bullion value of $33,634.00.
Notes/Text been Edited:
Abstracted from source text in table and restyled/written to sentence form.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 20.05.2023 (08:37:47)
Above Info was First Seen 20.05.2023

Type/Category of Info:
General Mining News
Info Source From:
Mining Science. Volume: 63 [LXIII], Issue No. 1629
Info Publication Date:
April 20, 1911
Info found on page:
430
Info Title:
Tailing Dam Across Wilson Creek Happenings
The Stratton's Independence Co. has secured enough land on each side of Wilson creek, south of the mill, to erect a reservoir and dam to retain the mill tailings.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 14.05.2023 (08:14:37)
Above Info was First Seen 14.05.2023

Type/Category of Info:
Article
Info Source From:
Mining Science. Volume: 63 [LXIII], Issue No. 1628
Info Publication Date:
April 13, 1911
Info found on page:
399
Info Title:
Cripple Creek District March 1911 Output
Table has multiple errors; numbers don't match the given sums at the bottom total, neither does the sum per line always! Unknown where errors are, so I made best guesses!
CRIPPLE CREEK ORE PRODUCTION.
———

According to statements of the smelter and mill representatives and the accompanying estimates of values, the output of Cripple Creek mines in March amounted to 73,125 tons, carrying a gross bullion value of $1,358,455. This production is 3,979 tons in excess of that of February for tonnage, and $105,401 in value.

Increases are shown at all of the plants, with the local mills handling an exceptionally heavy tonnage. This output is largely due to the favorable weather condition. The output:

Plant and location
Tonnage
Av.
Value
Total
Value
Standard Mill (U. S. R. & R.), Colorado City 14,350
14,050
22.00
$22.54
315,700
$316,700
Smelters, Denver & Pueblo 4,325
4,025
65.00
$67.24
270,925
$270,625
Golden Cycle, Colorado City 25,200
25,000
$20.00 504,000
$500,000
Portland mill, Colorado City 10,000 $20.00 $200,000
Portland mill, Battle Mountain 8,800 $3.60 $31,680
Stratton's Independence, Battle Mountain 9,250 $3.40 32,450
$31,450
Wild Horse mill, Bull Hill 12,000
2,000
3.00
$4.00
13,600
$8,000
Totals 73,125 $1,358,455
Notes/Text been Edited:
Table has multiple errors; numbers don't match sums at the bottom total, nor does per line always! Unknown where errors are, so I made best guesses!
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 14.05.2023 (07:30:41)
Above Info was First Seen 13.05.2023

Type/Category of Info:
General Mining News
Info Source From:
Mining Science. Volume: 63 [LXIII], Issue No. 1626
Info Publication Date:
March 30, 1911
Info found on page:
351
Info Title:
Bids for Tailing Dam Across Wilson Creek
Bids have been called for by Philip Argall, general manager of Stratton's Independence (Ltd.) for the construction of a dam across Wilson creek, and the specifications are in the hands of the contractors. The dam, to be built of masonry and cribbings, will be used for the storage of tailings from the Argall mill, now treating the dumps at the mine at a profit.
graphic for visual presentation of text The dam will be located on land recently purchased in the Cunningham addition to Victor.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 11.05.2023 (14:13:37)
Above Info was First Seen 11.05.2023

Type/Category of Info:
General Mining News
Info Source From:
Mining Science. Volume: 63 [LXIII], Issue No. 1623
Info Publication Date:
March 9, 1911
Info found on page:
274
Info Title:
Stratton's Independence Mill January 1911 Output
During January the Stratton Independence mill treated 9,619 tons with an average value of $3,40.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 10.05.2023 (18:44:49)
Above Info was First Seen 10.05.2023

Type/Category of Info:
Abstracts of Official Reports
Info Source From:
Mining Science. Volume: 63 [LXIII], Issue No. 1621
Info Publication Date:
February 23, 1911
Info found on page:
216
Info Title:
Stratton's Independence Mill December 1910 Output
Stratton's Independence. In December the Stratton's Indepence mill handled 9,232 tons of ore of an average value of $3.23 a ton.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 09.05.2023 (20:44:52)
Above Info was First Seen 09.05.2023

Type/Category of Info:
General Mining News
Info Source From:
Mining Science. Volume: 63 [LXIII], Issue No. 1614
Info Publication Date:
January 5, 1911
Info found on page:
21
Info Title:
Independence Mill Storage Issues Hamper Crusher Capacity
The crusher recently installed by the Stratton's Independence company to handle the ore from the dump will not be started until January 5. It has a capacity of 1,000 tons a day, but will crush only half that until storage for the crushed rock is provided.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 07.05.2023 (07:41:37)
Above Info was First Seen 07.05.2023

Type/Category of Info:
Special/Editorial Correspondence
Info Source From:
The Mining Magazine. Volume: 4 [IV], Issue No. 1
Info Publication Date:
January 1911
Info found on page:
34
Info Title:
Mr. Philip Argall & Independence Mill
At a banquet to celebrate the completion of the second unit of cyanide plant for the treatment of low grade dump ore at Stratton's Independence, Cripple Creek, Philip Argall gave a speech containing interesting reminiscences.
graphic for visual presentation of text Eighteen years ago he commenced his connection with the cyanide process by going to Deadwood, South Dakota, in the interests of the owners of the MacArthur-Forrest patents. At this spot in the Black Hills a cyanide plant had been erected and had proved a failure at first, and advice was required.
graphic for visual presentation of text His second trip was to what is now the Brodie mill at Cripple Creek, where the cyanide process was also a failure. In both these cases the ore was ground fine and could not be leached; this was in the days before slime agitators.
graphic for visual presentation of text Nevertheless Mr. Argall was firmly convinced that cyanide treatment would be the most suitable for Cripple Creek ores, and by tongue and pen was persistent in his advocacy of its adoption. Indeed he then made a design for a treatment plant which was adopted 14 years later at Stratton's Independence.
graphic for visual presentation of text His connection with Cripple Creek was renewed in 1907 when he was asked to design a plant to treat the dumps at Stratton's Independence. The gold content of these dumps was much less than the current cost of treatment, and it was obvious that some different method must be adopted. Roasting was out of the question.
graphic for visual presentation of textHe found by experiment that 35% of the gold could be recovered by wet concentration, and that another 35% could be obtained by cyaniding the remainder.
graphic for visual presentation of text With this 70% recovery the cost has proved to be less than $1.50 in a plant treating 7000 tons per month. This metallurgical improvement should have an important economic influence on the future of Cripple Creek and will make the beneficiation of the low grade sulpho-telluride ores a practical proposition.
Notes/Text been Edited:
Abstracted and partly rewritten from source text.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 10.10.2021 (18:51:24)
Above Info was First Seen 05.05.2021

Type/Category of Info:
Special/Editorial Correspondence
Info Source From:
The Mining Magazine. Volume: 4 [IV], Issue No. 1
Info Publication Date:
January 1911
Info found on page:
34
Info Title:
Independence Mill Production; November 1910
During November Shipments from the district to the Stratton's Independence Mill amounted to 8,000 tons of an average $3.00 per ton for a total of $24,000.
Notes/Text been Edited:
Abstracted and partly rewritten from source text.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 10.10.2021 (18:51:24)
Above Info was First Seen 05.05.2021

Type/Category of Info:
Correspondence and Discussion
Info Source From:
Metallurgical and Chemical Engineering. Volume: 9 [IX], Issue No. 1
Info Publication Date:
January 1911
Info found on page:
19
Info Title:
Stratton's Independence Mill Cyaniding Work
Stratton's Independence mill, which was started in 1909, was in operation during 1910 at about 50 per cent increased capacity This mill is treating dump ore of an average value of $3.60 at a cost of about $1.50 per ton. The ore is crushed and ground in cyanide solution, then concentrated to remove the sulphotellurides, after which the tailing is cyanided.
Notes/Text been Edited:
Abstracted & slightly rewritten from larger text about 'Status of Metallurgy in Colorado in 1910' p18->20, only taking a part linked to Cripple Creek
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 06.02.2023 (13:38:43)
Above Info was First Seen 04.02.2023

Type/Category of Info:
General Mining News
Info Source From:
The Engineering and Mining Journal. Volume: 90 [XC], Issue No. 24
Info Publication Date:
December 10, 1910
Info found on page:
1177
Info Title:
Stratton's Independence October Production
Stratton's Independence—Results for October:
graphic for visual presentation of textProduction, 1518 tons, averaging 24 dwt, 16 grains per ton.
graphic for visual presentation of textDump ore milled, 8200 tons.
graphic for visual presentation of textNet working profit, $10,115.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 25.12.2021 (16:34:34)
Above Info was First Seen 26.03.2010

Type/Category of Info:
General Mining News
Info Source From:
Mining Science. Volume: 62 [LXII], Issue No. 1610
Info Publication Date:
December 8, 1910
Info found on page:
558
Info Title:
Stratton's Independence Mill November 1910 Output
During November the Stratton's Independence plant processed 9,500 tons with an average value of $3.15 and a bullion value of $29,925.
Notes/Text been Edited:
Abstracted from source text in table and restyled/written to sentence form.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 03.05.2023 (10:04:40)
Above Info was First Seen 12.07.2010

Type/Category of Info:
General Mining News
Info Source From:
Mining Science. Volume: 62 [LXII], Issue No. 1606
Info Publication Date:
November 10, 1910
Info found on page:
453
Info Title:
Stratton's Independence Mill October 1910 Output
During October the Stratton's Independence plant on Battle Mountain processed 8,000 tons with an average value of $3.00 for a total value of $24,000.
Notes/Text been Edited:
Abstracted from source text in table and restyled/written to sentence form
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 30.04.2023 (21:22:02)
Above Info was First Seen 30.04.2023

Type/Category of Info:
General Mining News
Info Source From:
The Engineering and Mining Journal. Volume: 90 [XC], Issue No. 19
Info Publication Date:
November 5, 1910
Info found on page:
927
Info Title:
Stratton's Independence September Production
Stratton's Independence—Results for September are:
graphic for visual presentation of textProduction 1680 tons., averaging 22 cwt. 16 gr. per ton.
graphic for visual presentation of textDump ore milled, 7600 tons.
graphic for visual presentation of textNet working profit mine and mill, $10,750.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 24.12.2021 (18:50:26)
Above Info was First Seen 25.03.2010

Type/Category of Info:
General Mining News
Info Source From:
Mining Science. Volume: 62 [LXII], Issue No. 1601
Info Publication Date:
October 6, 1910
Info found on page:
332
Info Title:
Stratton's Independence Mill August 1910 Output
Stratton's Independence in August, according to official figures cabled to the London office, produced and treated in the company's mill 8,000 tons of ore averaging $2.86 a ton. This ore came from the dump, and ran lower than any previously treated, considerably lower than the average of the dump.
graphic for visual presentation of text It was handled at a profit, but the exact cost figures will not be available until the annual meeting of the stockholders in London, December 24. The August average from the Stratton's Independence dump is the lowest recorded for the Cripple Creek district.
Notes/Text been Edited:
Abstracted
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 29.04.2023 (20:57:03)
Above Info was First Seen 29.04.2023

Type/Category of Info:
General Mining News
Info Source From:
The Engineering and Mining Journal. Volume: 90 [XC], Issue No. 11
Info Publication Date:
September 10, 1910
Info found on page:
529
Info Title:
Stratton's Independence July Production
Stratton's Independence—The cabled July results:
graphic for visual presentation of textProduction, 1470 tons, averaging 26 dwt. 6 grains per ton.
graphic for visual presentation of textDump-ore milled, 8100 tons.
graphic for visual presentation of textNet working profit at both mine and mill departments, $11,310, less special development, $1580.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 23.12.2021 (21:23:41)
Above Info was First Seen 25.03.2010

Type/Category of Info:
General Mining News
Info Source From:
Mining Science. Volume: 62 [LXII], Issue No. 1597
Info Publication Date:
September 8, 1910
Info found on page:
236
Info Title:
Stratton's Independence Mill August 1910 Output
During August the Stratton's Independence plant processed 7,700 tons with an average value of $2.90 and a bullion value of $22,330. This tonnage was about the same as last month, with a slight decrease in the value of the ore treated.
Notes/Text been Edited:
Abstracted from source text in table and restyled/written to sentence form.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 28.04.2023 (12:30:23)
Above Info was First Seen 28.04.2023

Type/Category of Info:
General Mining News
Info Source From:
Mining Science. Volume: 62 [LXII], Issue No. 1596
Info Publication Date:
September 1, 1910
Info found on page:
212
Info Title:
Stratton's Independence Mill July 1910 Output
The tonnage of dump ores treated at the Stratton's Independence mill in July totaled 8,100 tons of an average value of $3 a ton, a total of $24,300. Of this amount $9,000 was received from concentrates and about $17,000 from precipitates.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 28.04.2023 (08:16:39)
Above Info was First Seen 28.04.2023

Type/Category of Info:
Article
Info Source From:
The Mineral Industry, Its Statistics, Technology & Trade in the U.S. and Other Countries. Volume: 18 [XVIII]
Info Publication Date:
September 1910
Info found on page:
338
Info Title:
Independence Mill 1907 Tidbits

In April 1909, the mill of the Independence company began operations, treating monthly about 5000 tons of dump ores averaging $3.60 gold per ton. The method of treatment is as follows:

  • The dump rock, loaded by a power shovel, is coarse-crushed in gyratory crushers and rolls.
  • The ore then passes to two Chilean mills crushing in cyanide solution and the pulp concentrated on tables to remove tellurides and sulphides.
  • The tailings from the tables are classified into sands and slimes, both of which are cyanided.
  • The concentrates are roasted and cyanided.
  • No detailed description of the mill is available.
Notes/Text been Edited:
Abstracted and slightly rewritten from source text about 'Cyanidation During 1909' by Charles H. Fulton.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 25.05.2022 (10:26:28)
Above Info was First Seen 25.05.2022

Type/Category of Info:
General Mining News
Info Source From:
The Engineering and Mining Journal. Volume: 90 [XC], Issue No. 7
Info Publication Date:
August 13, 1910
Info found on page:
335
Info Title:
Stratton's Independence June Production
Stratton's Independence—June production was 1643 tons of ore averaging 24 dwt. 8.4 gr. per ton. Dump ore milled 8000 tons.
graphic for visual presentation of text Net working profit from both mine and mill departments $12.500 less $1375, special development.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 20.12.2021 (08:13:39)
Above Info was First Seen 24.03.2010

Type/Category of Info:
Special/Editorial Correspondence
Info Source From:
The Engineering and Mining Journal. Volume: 90 [XC], Issue No. 3
Info Publication Date:
July 16, 1910
Info found on page:
134
Info Title:
Stratton's Independence, Ltd., Mill Runs Full Capacity
Denver, July 11—Stratton's Independence, Ltd., mill is running at full capacity on the ore-house dump. The grade of the ore has improved and is now about $3.50 per ton.
graphic for visual presentation of text The tonnage treated in June amounted to 7500, the highest month's run so far made.
Notes/Text been Edited:
Abstracted and slightly rewritten from source text.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 18.12.2021 (15:38:00)
Above Info was First Seen 18.12.2021

Type/Category of Info:
General Mining News
Info Source From:
The Engineering and Mining Journal. Volume: 90 [XC], Issue No. 3
Info Publication Date:
July 16, 1910
Info found on page:
137
Info Title:
Stratton's Independence May Production
Stratton's Independence—Results for May are:
graphic for visual presentation of textProduction, 2000 tons averaging 21 dwt. 52 gr. per ton
graphic for visual presentation of textDump ore milled, 6470 tons
graphic for visual presentation of textNet working profit, $7000 less special development, $1275.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 24.12.2021 (18:49:03)
Above Info was First Seen 24.03.2010

Type/Category of Info:
Article
Info Source From:
The Mining Magazine. Volume: 2 [II], Issue No. 2
Info Publication Date:
February 1910
Info found on page:
107
Info Title:
Stratton's Independence Mill to Be Enlarged
The striking feature of the year, metallurgically, was this development of mills. Stratton's Independence plant has made so good a record as to lead to enlargement.
Notes/Text been Edited:
Abstracted from source text
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 10.10.2021 (18:51:24)
Above Info was First Seen 05.05.2021

Type/Category of Info:
Special/Editorial Correspondence
Info Source From:
The Engineering and Mining Journal. Volume: 88 [LXXXVIII], Issue No. 20
Info Publication Date:
November 13, 1909
Info found on page:
994
Info Title:
Stratton's Independence, Mill and Mine Working
Denver. Nov. 5—At Stratton's Independence the third chilean mill is being erected, which will bring the capacity of the mill up to 8000 tons per month. The buildings are completed, but the usual delay is being experienced in the arrival of machinery. An automatic power shovel of 60 tons per hour capacity was placed in position in the deep cut in the dump this week, and will be in operation in a few days. The mine continues to make a fairly steady production under lessees and company operation, the output being about 2000 tons per month, worth $50,000.
Notes/Text been Edited:
Abstracted from article with info about various Colorado stuff.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 30.10.2020 (11:04:30)
Above Info was First Seen 20.05.2019

Type/Category of Info:
General Mining News
Info Source From:
Mining Science. Volume: 60 [LX], Issue No. 1549
Info Publication Date:
October 7, 1909
Info found on page:
331
Info Title:
Stratton's Independence Mill September Output
The Stratton's Independence Mill is estimated to have treated during September a tonnage of 5,000 tons with an average value of $4.50 for a total of $22,500.
Notes/Text been Edited:
Abstracted from source text in table and restyled/written to sentence form.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 11.04.2022 (13:40:04)
Above Info was First Seen 22.06.2010

Type/Category of Info:
Special/Editorial Correspondence
Info Source From:
The Mining Magazine. Volume: 1 [I], Issue No. 2
Info Publication Date:
October 1909
Info found on page:
103
Info Title:
Stratton's Independence Mill Stuff
Denver—Both smelters and chlorination mills have been dropping behind in the race for tonnage, in accordance with the rule that as the grade of ore drops the cheaper but less efficient processes become economical.
graphic for visual presentation of text The beginning of a further step is seen in the introduction, by Philip Argall, of concentration into the mill of Stratton's Independence, for treating low-grade and dump ores. It is found that 30% of the gold in these ores can be so saved. By supplementing cyanidation, a total saving of 65% is effected.
graphic for visual presentation of text The low value of the ore makes it unprofitable to attempt a closer saving.
Notes/Text been Edited:
Abstracted and slightly rewritten from source text.
Above Info was Last Updated on 30.10.2020 (11:04:30)
Above Info was First Seen 23.02.2020

Type/Category of Info:
General Mining News
Info Source From:
Mining Science. Volume: 60 [LX], Issue No. 1545
Info Publication Date:
September 9, 1909
Info found on page:
235
Info Title:
Stratton's Independence Mill August Output
The Stratton's Independence Mill is estimated to have treated during August a tonnage of 4,000 tons with an average value of $4.30 for a total of $17,200.00.
Notes/Text been Edited:
Abstracted from source text in table and restyled/written to sentence form.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 10.04.2022 (14:38:13)
Above Info was First Seen 10.04.2022

Type/Category of Info:
General Mining News
Info Source From:
The Western Investors Review. Volume: 15 [XV], Issue No. 12
Info Publication Date:
July 1909
Info found on page:
10
Info Title:
Stratton's Independence Mill June 1909 Output
During June the Stratton's Independence plant processed 3,000 tons with an average value of $2.50 and a bullion value of $7,500.
Notes/Text been Edited:
Abstracted from source text in table and restyled/written to sentence form.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 24.08.2023 (12:22:21)
Above Info was First Seen 19.10.2010

Type/Category of Info:
Article
Info Source From:
Mining Science. Volume: 59 [LIX], Issue No. 1532
Info Publication Date:
June 10, 1909
Info found on page:
447
Info Title:
Milling and Saving Low-Grade Telluride Ores Possible
MILLING AND SAVING LOW-GRADE TELLURIDE ORES.
graphic for visual presentation of text—————————
graphic for visual presentation of text The president of the Portland company, at Cripple Creek, Colo., in his annual report, stated that discoveries made by the company's metallurgist made possible the successful treatment without roasting of low-grade telluride ores.
graphic for visual presentation of text The general manager of the Golden Cycle' also announced that his experts have a dry concentrating process which will effect the same end.
graphic for visual presentation of text A mill has also been erected at the Stratton Independence for treating the low-grade ore of the dump.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 15.03.2022 (12:39:09)
Above Info was First Seen 20.06.2010

Type/Category of Info:
General Mining News
Info Source From:
Mining and Scientific Press. Volume: 98 [XCVIII], Issue No. 2547; 20
Info Publication Date:
May 15, 1909
Info found on page:
678
Info Title:
Stratton's Independence Mill Working Small Scale Operation
The new mill of the Stratton's Independence has so far only worked on a small scale, the nominal capacity being 300 tons per day. And in the absence of Philip Argall, fact is that returns could not be obtained so it has not helped with the Cripple Creek production numbers for April.
Notes/Text been Edited:
Abstracted and slightly rewritten from source text.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 20.04.2022 (17:16:26)
Above Info was First Seen 20.04.2022

Type/Category of Info:
Article
Info Source From:
Mines and Minerals. Volume: 29 [XXIX], Issue No. 10
Info Publication Date:
May 1909
Info found on page:
444
Info Title:
Stratton's Independence Mill Cyanide Work
For several years past Colorado metallurgists have been attempting to solve the metallurgical puzzle presented by the low-grade ores of Cripple Creek. Millions of tons of ore running from $3 to $10 per ton have lain on the great dumps for years, while other millions were exposed in hundreds of miles of underground workings. Thus, for some years previous to 1907, the issues were clearly presented, first, to eliminate roasting the ores if possible, and, second, to eliminate freight charges by building mills at the mines.
graphic for visual presentation of text It will, of course, be understood that until a way of eliminating the roasting of the tellurium ores was discovered, it would be useless to erect mills at the Cripple Creek mines where roasting costs even more than at Colorado Springs.
graphic for visual presentation of text
graphic for visual presentation of text The first great plant to be erected at the mines was that of the Stratton Independence Co. nearly two years ago. Little information is available concerning this, except that the method of treatment followed was fine grinding of ore followed by cyaniding.
graphic for visual presentation of text Owing to the low grade of this company's dump ores the mill has not so readily proved successful up to the present time as it might had it treated the dumps of other mines.
Notes/Text been Edited:
Abstracted from a somewhat longer text about Cyaniding Cripple Creek Dumps.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 30.10.2020 (11:04:30)
Above Info was First Seen 23.03.2019

Type/Category of Info:
General Mining News
Info Source From:
Mining Science. Volume: 59 [LIX], Issue No. 1524
Info Publication Date:
April 15, 1909
Info found on page:
297
Info Title:
Stratton Independence Mill Runs on Low-Grade Ore
The mill of the Independence has been running steadily on low-grade ores from the mine. Minor repairs have been made to the roasting department and the tonnage will be gradually increased until the plant is running full capacity on both the dump and mine ores.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 13.03.2022 (14:19:40)
Above Info was First Seen 19.06.2010

Type/Category of Info:
General Mining News
Info Source From:
Mining and Scientific Press. Volume: 98 [XCVIII], Issue No. 2542; 15
Info Publication Date:
April 10, 1909
Info found on page:
502
Info Title:
Stratton's Independence Mill Closed Down
The new mill at Stratton's Independence has been closed down, and the employees have been discharged without any date being set for their return. It is declared at the office of the company that the shut-down is but temporary, for the purpose of alterations to the roasting plant.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 19.04.2022 (08:07:39)
Above Info was First Seen 18.04.2022

Type/Category of Info:
General Mining News
Info Source From:
Mining Science. Volume: 59 [LIX], Issue No. 1523
Info Publication Date:
April 8, 1909
Info found on page:
277
Info Title:
Stratton's Independence Cyanide Mill Closed Down
The cyanide mill of Stratton's Independence has been closed down preparatory to alterations and repairs.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 13.03.2022 (12:37:33)
Above Info was First Seen 19.06.2010

Type/Category of Info:
General Mining News
Info Source From:
Mining Science. Volume: 59 [LIX], Issue No. 1519
Info Publication Date:
March 11, 1909
Info found on page:
196
Info Title:
Stratton's Independence Mill Commenced Dump Treatment
The mill at Stratton's Independence has commenced the treatment of dump rock. The tonnage to be handled will be raised to 5,000 tons per month.
graphic for visual presentation of text It is estimated that an average of $3 a ton will be treated therefrom.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 12.03.2022 (07:40:14)
Above Info was First Seen 17.06.2010

Type/Category of Info:
General Mining News
Info Source From:
The Western Investors Review. Volume: 15 [XV], Issue No. 8
Info Publication Date:
February 1909
Info found on page:
21
Info Title:
Low Grade Ore Treated
The mills of the Trilby Mines company and the Stratton Independence company are now treating their low grade ores.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 22.08.2023 (08:16:21)
Above Info was First Seen 19.10.2010

Type/Category of Info:
General Mining News
Info Source From:
Mining and Scientific Press. Volume: 98 [XCVIII], Issue No. 2534; 7
Info Publication Date:
February 13, 1909
Info found on page:
236
Info Title:
Stratton's Independence Mill Been Running Light
The new plant at Stratton's Independence began operations shortly after the new year, and has been running light for about fifteen days.
graphic for visual presentation of text During this period the general manager, Philip Argall, reports that 500 tons of $7 ore were treated.
graphic for visual presentation of text The machinery is adjusting itself and the tonnage to be treated during February will be materially increased.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 16.04.2022 (14:28:32)
Above Info was First Seen 05.05.2010

Type/Category of Info:
General Mining News
Info Source From:
Mining Science. Volume: 59 [LIX], Issue No. 1510
Info Publication Date:
January 7, 1909
Info found on page:
17
Info Title:
Stratton's Independence Mill Will Resume Operations
The Stratton Independence mill will resume active operations within a few days and by Feb. 1 will be running at full capacity.
Notes/Text been Edited:
Abstracted and slightly rewritten from source text.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 08.03.2022 (23:14:29)
Above Info was First Seen 16.06.2010

Type/Category of Info:
General Mining News
Info Source From:
Mining and Scientific Press. Volume: 97 [XCVII], Issue No. 2525; 24
Info Publication Date:
December 12, 1908
Info found on page:
796
Info Title:
Cyanide Mill at Stratton's Independence Will Treat Ore Next Year
Philip Argall, of Denver, consulting engineer of Stratton's Independence Limited and the designer and manager of the new cyanide mill of that corporation, is authority for the statement that the new plant will be treating ore by January 4.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 14.08.2023 (11:06:17)
Above Info was First Seen 30.09.2010

Type/Category of Info:
General Mining News
Info Source From:
The Mining World. Volume: 29 [XXIX], Issue No. 23
Info Publication Date:
December 5, 1908
Info found on page:
860
Info Title:
Stratton's Independence Mill Commence Work by New Year
Cripple Creek—Philip Argall, consulting engineer of Strattons Independence, Ltd., and the designer of the new cyanide mill erected for that company, announces that the mill will commence treating ores from the big dump on or about Jan. 4.
graphic for visual presentation of text The leasing system now in vogue will be continued and the company will also work the blocks reserved for its use.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 05.01.2024 (12:31:43)
Above Info was First Seen 05.01.2024

Type/Category of Info:
General Mining News
Info Source From:
Mining Science. Volume: 58 [LVIII], Issue No. 1505
Info Publication Date:
December 3, 1908
Info found on page:
457
Info Title:
Stratton Independence Mill to Resume in January
It is stated that the new Stratton Independence will resume operations about the 1st of January. A few alterations are being made preparatory for starting.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 09.04.2023 (18:40:17)
Above Info was First Seen 16.06.2010

Type/Category of Info:
General Mining News
Info Source From:
The Mining World. Volume: 29 [XXIX], Issue No. 21
Info Publication Date:
November 21, 1908
Info found on page:
787
Info Title:
Stratton Independence Reorganization & Mill to Start Up
Cripple Creek—It is reported from London that a reorganization of the Stratton Independence has been effected and that the big mill is to be started up.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 05.01.2024 (09:34:44)
Above Info was First Seen 05.01.2024

Type/Category of Info:
General Mining News
Info Source From:
Mining and Scientific Press. Volume: 97 [XCVII], Issue No. 2508; 7
Info Publication Date:
August 15, 1908
Info found on page:
205
Info Title:
Stratton's Independence Mill Test Run
A test run was started last week at the mill on the Stratton's Independence, for the purpose of determining the best method of treating some of the ores produced from the mine.
graphic for visual presentation of text At the conclusion of these tests, and possibly one on the sulphide ores, it is reported that the big mill will start actual operations.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 12.08.2023 (11:46:20)
Above Info was First Seen 29.09.2010

Type/Category of Info:
General Mining News
Info Source From:
The Mining World. Volume: 29 [XXIX], Issue No. 7
Info Publication Date:
August 15, 1908
Info found on page:
254
Info Title:
Stratton Independence Mill Test Run Made
Cripple Creek—A test run of 75 tons has been made at the big mill on the Stratton Independence. It was found to carry $15 per ton average.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 30.12.2023 (14:12:48)
Above Info was First Seen 30.12.2023

Type/Category of Info:
General Mining News
Info Source From:
Mining Science. Volume: 58 [LVIII], Issue No. 7
Info Publication Date:
August 13, 1908
Info found on page:
137
Info Title:
Stratton's Independence Mill Did Test Run
A test run was recently made at the Stratton Independence mill for experimental determination.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 01.04.2023 (07:52:06)
Above Info was First Seen 15.06.2010

Type/Category of Info:
General Mining News
Info Source From:
The Mining World. Volume: 29 [XXIX], Issue No. 6
Info Publication Date:
August 8, 1908
Info found on page:
217
Info Title:
Stratton's Independence Mill Ordered to Start Up
Cripple Creek—Orders to start up the big Independence mill at once are expected from London.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 30.12.2023 (12:27:33)
Above Info was First Seen 30.12.2023

Type/Category of Info:
General Mining News
Info Source From:
The Mining World. Volume: 29 [XXIX], Issue No. 1
Info Publication Date:
July 4, 1908
Info found on page:
33
Info Title:
New Stratton Independence Cyanide Mill Completed and Test Run Proven Satisfactory
Cripple Creek—The new Stratton Independence cyanide mill is completed and a test run on 1,000 tons of ore has proven satisfactory. This mill will have a capacity of 5,000 tons per month.
graphic for visual presentation of text Low-grade ores from the Independence mine, formerly sent to the United Reduction works at Colorado City, will be treated at the new mill and their shipment stopped. The higher grades will be shipped as before.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 28.12.2023 (16:32:54)
Above Info was First Seen 28.12.2023

Type/Category of Info:
General Mining News
Info Source From:
Mining Science. Volume: 57 [LVII], Issue No. 25
Info Publication Date:
June 18, 1908
Info found on page:
580
Info Title:
Stratton's Independence Mill Might Impact June Production
It is hoped that the Stratton Independence mill will also be started up regularly during the month of June, but this is uncertain.
Notes/Text been Edited:
Abstracted and slightly rewritten from source text.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 19.03.2023 (12:54:40)
Above Info was First Seen 13.06.2010

Type/Category of Info:
Special/Editorial Correspondence
Info Source From:
Mining and Scientific Press. Volume: 96 [XCVI], Issue No. 2493; 18
Info Publication Date:
May 2, 1908
Info found on page:
586
Info Title:
Stratton's Independence, Ltd. Statement Abstracts
DENVER, COLORADO.—A statement issued by the board of directors of Stratton's Independence, Ltd., under date of April 11, summarizes the report of Philip Argall, consulting engineer to the company, announcing the completion of the new mill, and its satisfactory operation.
graphic for visual presentation of text The mill has a capacity of about 300 tons per day, and cost approximately $230,000. The ore on the dump, aggregating 600,000 tons, will be treated, in addition to the regular output of the mine.
graphic for visual presentation of text Regarding the proposed introduction of the caving system of mining, Mr. Argall says, "it will be necessary to take one level at a time and begin work at the farthest point from the main shaft, that is, the northern part of the property, starting the first 'cave' near the property line, preferably on the first level. When this cave is exhausted of profitable ore, another cave can be started nearer the shaft, and two or more can be operated simultaneously on separate veins. The object in each case will be similar, namely, to begin caving at the farthest point from the main shaft and gradually work back to the limits of pay-ore, extracting all the ore possible by drawing the 'caves' and leaving the ground and level behind completely caved and exhausted of pay-ore.
graphic for visual presentation of text When No. 1 level is so worked, caved, and abandoned, No. 2 can be taken up and treated in a similar way, and so with the deeper levels. If the main 'cave' on No. 5 level were first drawn, the 'cave' would soon pass into the hanging wall of the veins, and bring down barren country, as well as destroy completely the superincumbent levels.
graphic for visual presentation of text Furthermore, by caving the upper levels first, the lower levels as opened can be worked under lease, while the caving system is in full swing. The lessees can mine all the high-grade streak on the lower levels, but they must properly timber and secure the ground opened."
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 06.08.2023 (22:58:15)
Above Info was First Seen 06.08.2023

Type/Category of Info:
General Mining News
Info Source From:
The Mining World. Volume: 28 [XXVIII], Issue No. 15
Info Publication Date:
April 11, 1908
Info found on page:
612
Info Title:
Stratton's Independence Mill Test Run Satisfied
Cripple Creek—The new mill at the Independence mine has been given a test run and the results are reported satisfactory by the manager, Charles M. Becker, Phillip Argall was the designing engineer. The mill will treat exclusively ores from the Independence mine and dump, particularly the low-grade ores.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 21.12.2023 (17:39:05)
Above Info was First Seen 21.12.2023

Type/Category of Info:
General Mining News
Info Source From:
Mining Science. Volume: 57 [LVII], Issue No. 15
Info Publication Date:
April 9, 1908
Info found on page:
369
Info Title:
Stratton's Independence Mill Put Into Commission
During the month of March, the new Stratton's Independence mill, known as the Argall mill, was put into commission, with a rated capacity of 480 tons per day. With this mill running at full capacity, it is estimated that the output for April will be materially increased.
Notes/Text been Edited:
Abstracted and slightly rewritten from larger text about 'Review of Colorado Mining'
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 15.03.2023 (19:37:54)
Above Info was First Seen 11.06.2010

Type/Category of Info:
Special/Editorial Correspondence
Info Source From:
Mining and Scientific Press. Volume: 96 [XCVI], Issue No. 2489; 14
Info Publication Date:
April 4, 1908
Info found on page:
445
Info Title:
Stratton's Independence Cyanide Mill Completed
DENVER, COLORADO.—The Stratton's Independence cyanide mill has been completed and tested until perfectly satisfactory results have been obtained. This mill was designed by Philip Argall. It is up to date in every respect, employing the best features in American and foreign practice. The capacity of the mill is 6500 tons per month.
graphic for visual presentation of text Only low-grade oxidized ore from the Stratton's Independence dump and mine will be treated.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 05.08.2023 (22:46:34)
Above Info was First Seen 05.08.2023

Type/Category of Info:
General Mining News
Info Source From:
Mining Science. Volume: 57 [LVII], Issue No. 14
Info Publication Date:
April 2, 1908
Info found on page:
353
Info Title:
New Independence Mill Pleases
The new Independence mill is being tried out experimentally and Chas. M. Becker, Gen. Mgr., reports himself as highly pleased with the results.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 15.03.2023 (18:27:22)
Above Info was First Seen 11.06.2010

Type/Category of Info:
General Mining News
Info Source From:
The Mining World. Volume: 28 [XXVIII], Issue No. 13
Info Publication Date:
March 28, 1908
Info found on page:
535
Info Title:
Stratton's Independence Mill Completed
Denver—The Stratton's Independence mill at Victor is now completed and ready for the treatment of mineral. The mill has a capacity of 6,500 tons a month and is equipped with all the latest improved machinery and devices for the handling of different grades of ore.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 20.12.2023 (09:12:11)
Above Info was First Seen 29.11.2010

Type/Category of Info:
General Mining News
Info Source From:
Mining Science. Volume: 57 [LVII], Issue No. 12
Info Publication Date:
March 19, 1908
Info found on page:
312
Info Title:
Stratton's Independence Mill Test Run a Success
The new Argall mill at Stratton's Independence was to have been put in commission this week at a capacity of 480 tons. A test run made a short time ago was declared very successful.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 10.03.2023 (09:16:27)
Above Info was First Seen 10.06.2010

Type/Category of Info:
General Mining News
Info Source From:
Mining Science. Volume: 57 [LVII], Issue No. 8
Info Publication Date:
February 20, 1908
Info found on page:
209
Info Title:
Stratton's Independence Mill Expects Commission Early March
The first 150-ton unit of the milling plant at Stratton's Independence, Ltd., is expected to be in commission early in March. This unit will run on low-grade dump rock.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 08.03.2023 (08:19:38)
Above Info was First Seen 09.06.2010

Type/Category of Info:
Special/Editorial Correspondence
Info Source From:
Mining and Scientific Press. Volume: 96 [XCVI], Issue No. 2479; 4
Info Publication Date:
January 25, 1908
Info found on page:
121
Info Title:
Stratton's Independence, Ltd., Co.'s Cyanide Plant Under Cover
The Stratton's Independence, Ltd., Co.'s cyanide plant is under cover, and machinery is arriving daily, a very businesslike activity prevailing; a trial run will probably be mode in March, depending on the prompt arrival of machinery.
Notes/Text been Edited:
Abstracted
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 31.07.2023 (23:29:25)
Above Info was First Seen 31.07.2023

Type/Category of Info:
General Mining News
Info Source From:
The Mining World. Volume: 28 [XXVIII], Issue No. 4
Info Publication Date:
January 25, 1908
Info found on page:
164
Info Title:
Stratton's Independence Mill to Be Running by March
The mill which is being erected at the Stratton Independence property, at a cost of $250,000, will be able to treat $3 ore at a profit. It is estimated that there are now on the dump over 8,000,000 tons that will average over $3.50 per ton.
graphic for visual presentation of text The mill will be running by March 1, 1908.
Notes/Text been Edited:
Abstracted
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 15.12.2023 (19:14:50)
Above Info was First Seen 28.11.2010

Type/Category of Info:
General Mining News
Info Source From:
Mining Science. Volume: 56 [LVI], Issue No. 26
Info Publication Date:
December 26, 1907
Info found on page:
628
Info Title:
Stratton's Independence Mill Expects to See Work in January
It is expected that a portion of the building mill at Stratton's Independence, Ltd. mine, will be put in commission early in January.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 03.08.2022 (20:12:25)
Above Info was First Seen 03.08.2022

Type/Category of Info:
General Mining News
Info Source From:
The Western Investors Review. Volume: 14 [XIV], Issue No. 6
Info Publication Date:
November 1907
Info found on page:
66
Info Title:
Dam Across Wilson Creek Plans Due to Mill
CRIPPLE CREEK.—Plans are being made for a 20-foot dam of solid masonry to span Wilson creek and hold back the flow for future use at the new cyanide mill under construction by Stratton's Independence, Ltd.
graphic for visual presentation of text The lake thus formed will have a storage capacity of approximately 17,000,000 gallons.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 16.08.2023 (08:45:13)
Above Info was First Seen 18.10.2010

Type/Category of Info:
General Mining News
Info Source From:
Mining Reporter. Volume: 56 [LVI], Issue No. 18
Info Publication Date:
October 31, 1907
Info found on page:
409
Info Title:
Cyanide Mill Work Pushed at Stratton's Independence
Construction work is being pushed on the cyanide plant building by the Stratton's Independence Co. on Battle mountain.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 01.08.2022 (23:52:23)
Above Info was First Seen 01.08.2022

Type/Category of Info:
General Mining News
Info Source From:
The Mining World. Volume: 27 [XXVII], Issue No. 15
Info Publication Date:
October 12, 1907
Info found on page:
609
Info Title:
New Stratton Independence Mill Numbers
Cripple Creek.—For the new Stratton Independence mill more than $250,000 worth of the latest improved machinery has been ordered and is now being manufactured in Denver and eastern cities.
graphic for visual presentation of text The dump to work which this large expenditure is made is estimated to contain 1,000,000 tons of low-grade oxidized ore, carrying from $5 to $6 per ton. Yet untouched in the upper workings of the mine are thousands of tons of like material.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 07.12.2023 (08:54:50)
Above Info was First Seen 07.12.2023

Type/Category of Info:
General Mining News
Info Source From:
The Mining World. Volume: 27 [XXVII], Issue No. 9
Info Publication Date:
August 31, 1907
Info found on page:
364
Info Title:
Structural Work on New Stratton Independence Mill to Start
Cripple Creek—Machine drills will be used in breaking ground for the new Stratton, Independence mill. Structural work on the plant will start this week.
graphic for visual presentation of text Manager Becker expects to have the mill completed long before the first of next year.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 01.12.2023 (09:18:27)
Above Info was First Seen 26.11.2010

Type/Category of Info:
General Mining News
Info Source From:
The Mining World. Volume: 27 [XXVII], Issue No. 7
Info Publication Date:
August 17, 1907
Info found on page:
286
Info Title:
Grading Been Completed at Site of New Mill of Stratton Independence
Denver.—The grading has been completed at the site of the new mill of the Stratton Independence and work on the foundations will commence as soon as the contracts for construction are awarded.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 29.11.2023 (06:43:52)
Above Info was First Seen 29.11.2023

Type/Category of Info:
Article
Info Source From:
Mineral Resources of the United States. Volume: 23 [XXIII]
Info Publication Date:
August 1907
Info found on page:
238
Info Title:
Independence Mill Erected in 1907
Tests extending over a long period on ore from the Independence dump led this company to decide to erect a large cyanide plant at their mine, above Victor, during 1907.
Notes/Text been Edited:
Abstracted
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 03.07.2022 (20:25:18)
Above Info was First Seen 10.05.2010

Type/Category of Info:
General Mining News
Info Source From:
The Mining World. Volume: 27 [XXVII], Issue No. 5
Info Publication Date:
August 3, 1907
Info found on page:
204
Info Title:
Stratton's Independence Mill Work Being Pushed
Denver.—The manager of the Stratton Independence is pushing work on its new mill at Wilson creek. The heavy timbers and other building material are now enroute from Oregon and will be here in a few days.
graphic for visual presentation of text The construction will be supervised by Philip Argall.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 28.11.2023 (14:50:38)
Above Info was First Seen 25.11.2010

Type/Category of Info:
General Mining News
Info Source From:
The Mining World. Volume: 27 [XXVII], Issue No. 3
Info Publication Date:
July 20, 1907
Info found on page:
116
Info Title:
Workmen Clearing Site for New Stratton Independence Mill
Denver.—Workmen are clearing the site for the new Stratton Independence mill on Battle mountain, plans for which have been received.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 27.11.2023 (17:20:35)
Above Info was First Seen 27.11.2023

Type/Category of Info:
General Mining News
Info Source From:
The Mining World. Volume: 27 [XXVII], Issue No. 3
Info Publication Date:
July 20, 1907
Info found on page:
116
Info Title:
New Stratton's Independence Mill Stuff
Denver.—Ground is being broken for the 6,500-ton mill of the Independence Co. at Victor. The mill will be a combination of concentrating, roasting and cyaniding. The Independence dump has about 700,000 tons, much of which is oxidized.
graphic for visual presentation of text Twenty-five shafts were sunk in the dump 4 ft. apart and all walls sampled. Assays above $5 per ton were thrown out making an average of $3.70 per ton for the entire dump. The management expects to treat the ore for $2.70 per ton, leaving $1 net profit.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 27.11.2023 (18:09:08)
Above Info was First Seen 27.11.2023

Type/Category of Info:
General Mining News
Info Source From:
Mining Reporter. Volume: 56 [LVI], Issue No. 3
Info Publication Date:
July 18, 1907
Info found on page:
67
Info Title:
Independence Mill Ground Work Being Done
The work of clearing the ground for the erection of the large cyanide plant of the Stratton’s Independence Company at Strattonia is under way.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 19.07.2022 (17:42:43)
Above Info was First Seen 19.07.2022

Type/Category of Info:
General Mining News
Info Source From:
The Mining World. Volume: 27 [XXVII], Issue No. 2
Info Publication Date:
July 13, 1907
Info found on page:
77
Info Title:
Stratton's Independence Cyanide Mill Construction Started
Cripple Creek—The London owners of the Stratton Independence property have cabled orders to begin work at once on the construction of a cyanide mill equal to the reduction of 6,500 tons per month.
graphic for visual presentation of text The practical execution of this order began on the 8th instant. It will consist of two units equipped for concentration and cyaniding with a roaster to be used when needed.
graphic for visual presentation of text When finished the Venture Corporation will treat all its own ores including a dump which contains approximately 800,000 tons. The new establishment will be located on Wilson creek at a camp called Stratonia and Philip Argall is the consulting engineer.
graphic for visual presentation of text It will be automatic throughout, operated by electric power and the first estimate of cost is about $250,000. The determination to build and the employment of Philip Argall is the result of long experimenting with the various classes of ores and the adoption of a system recommended by him.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 27.11.2023 (08:10:39)
Above Info was First Seen 25.11.2010

Type/Category of Info:
General Mining News
Info Source From:
Mining Reporter. Volume: 56 [LVI], Issue No. 2
Info Publication Date:
July 11, 1907
Info found on page:
38
Info Title:
Stratton’s Independence, Ltd., Announced Mill in June
An important announcement for the district in June was that Stratton’s Independence, Ltd., would immediately begin the construction of an immense cyanide plant of a monthly capacity of 6,500 tons, with arrangements so that the plant's capacity may be increased, as occasion demands, to a capacity of 10,000 or 12,000 tons monthly.
graphic for visual presentation of text The construction of this immense plant is under the direction of Mr. Philip Argall of Denver.
Notes/Text been Edited:
Abstracted from larger text about 'Review of Mining Conditions in Colorado'
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 19.07.2022 (11:42:43)
Above Info was First Seen 19.07.2022

Type/Category of Info:
General Mining News
Info Source From:
Mining Reporter. Volume: 55 [LV], Issue No. 14
Info Publication Date:
April 4, 1907
Info found on page:
317
Info Title:
Stratton's Independence Mill Rumors
It is rumored that plans have been perfected for the early erection of a large cyanide plant on the Battle Mountain property of the Stratton's Independence Mining Company.
graphic for visual presentation of text It will presumably be modeled after the Golden Cycle plant, designed and erected under the supervision of Philip Argall.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 12.07.2022 (07:27:46)
Above Info was First Seen 06.06.2010

Type/Category of Info:
Personals
Info Source From:
The Mining and Scientific Press. Volume: 94 [XCIV], Issue No. 13
Info Publication Date:
March 30, 1907
Info found on page:
386
Info Title:
Mr. H. E. Nelson in Charge of Stratton's Independence Mill Construction
H. E. NELSON, who has been superintendent of construction for the Golden Cycle mill at Colorado City, has resigned to take charge of the construction work of the new mill of Stratton's Independence at Victor, in the Cripple Creek district.
Above Info was Last Updated on 10.10.2021 (18:51:24)
Above Info was First Seen 22.05.2021

Type/Category of Info:
Special/Editorial Correspondence
Info Source From:
The Mining and Scientific Press. Volume: 94 [XCIV], Issue No. 7
Info Publication Date:
February 16, 1907
Info found on page:
207
Info Title:
Stratton's Independence Cyanide Mill Rumors
Denver, Colorado.
graphic for visual presentation of textCompetition Between Cyanidation and Chlorination.
graphic for visual presentation of text—New Mill.
graphic for visual presentation of text With the 16% reduction in the output for 1906 for the Cripple Creek District, compared with that of 1905, has come a corresponding pressure for the reduction of treatment charges. Cyanidation has locked horns with chlorination in what promises to be a death struggle and all who are interested are anxiously awaiting the outcome.
graphic for visual presentation of text It is said that Stratton's Independence, Ltd., is planning the erection of a cyanide mill.
graphic for visual presentation of text Altogether, it seems as though cyanidation were destined soon to triumph. Bromo-cyanidation will now have a fair chance, and it would not be strange if it were to make a better showing than it has in previous trials.
Notes/Text been Edited:
Abstracted, restyled and slightly rewritten from source text.
Above Info was Last Updated on 10.10.2021 (18:51:24)
Above Info was First Seen 21.05.2021

Type/Category of Info:
General Mining News
Info Source From:
The Mining World. Volume: 26 [XXVI], Issue No. 4
Info Publication Date:
January 26, 1907
Info found on page:
132
Info Title:
Stratton's Independence Contemplating Erection of Cyanide Mill
The directors of Stratton's Independence are also contemplating the erection of a cyanide mill for the dump and low grades. It seems probable therefore that within the next 2 years the tonnage of ore treated in the district will be almost as large as that now being sent to Florence, Colorado City and the smelters.
Notes/Text been Edited:
Abstracted
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 11.11.2023 (09:09:46)
Above Info was First Seen 11.11.2023

Type/Category of Info:
Special/Editorial Correspondence
Info Source From:
The Mining and Scientific Press. Volume: 94 [XCIV], Issue No. 1
Info Publication Date:
January 5, 1907
Info found on page:
6
Info Title:
Stratton’s Independence, Ltd., Wants Cyanide Mill
Annual Review.
graphic for visual presentation of textPopularity of Cyanidation.
graphic for visual presentation of text At the annual meeting of Stratton's Independence, Ltd., held at London on December 19, the erection of a mill on the company's property on Battle mountain was considered.
graphic for visual presentation of text Elaborate sampling of the mine and dump has been carried on this year to determine the quantity and value of the ore available for treating by cyaniding processes. The results were encouraging.
graphic for visual presentation of text Now that most of the mines have got to a stage where the greater part of the ore is low grade, ranging between $4 and $12 per ton, the cyanide process and its modifications seem to be the only means by which this ore may be treated at a profit.
Above Info was Last Updated on 10.10.2021 (18:51:24)
Above Info was First Seen 18.05.2021

Type/Category of Info:
General Mining News
Info Source From:
The Mining World. Volume: 25 [XXV], Issue No. 26
Info Publication Date:
December 29, 1906
Info found on page:
787
Info Title:
Stratton’s Independence Said to Have Declared Dividend and Possible Cyanide Mill

Denver.—The directors of the WaltonStratton's Independence in London are supposed to have declared on the 19th inst. a dividend of $100,000 to $125,000. It is believed that they also took favorable action on a proposition, pending for some time, looking to the erection of a large cyanide plant for the great mass of low grade stuff available.

Notes/Text been Edited:
I am pretty certain this is about Stratton's Independence, not 'Walton Independence'
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 09.11.2023 (17:31:22)
Above Info was First Seen 09.11.2023

Type/Category of Info:
General Mining News
Info Source From:
Mining Reporter. Volume: 53 [LIII], Issue No. 7
Info Publication Date:
February 15, 1906
Info found on page:
178
Info Title:
Independence to Erect Treatment Plant
Independence.—Recent expert examination of this property has revealed the fact that there are low grade ore reserves valued at $5,000,000. It is calculated that there is enough of this material to warrant the company in the erection of a large treatment plant.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 12.02.2023 (13:41:28)
Above Info was First Seen 01.06.2010

Type/Category of Info:
General Mining News
Info Source From:
Mining Reporter. Volume: 50 [L], Issue No. 11
Info Publication Date:
September 15, 1904
Info found on page:
281
Info Title:
Stratton's Independence, Ltd. Milling Experiments Probably Leads to Mill
Stratton's Independence, Ltd.—During the past year experiments have been in progress to determine if the immense tonnage contained in the dumps of this company could be handled at a profit. It is reported that after many discouraging tests, it has been found that the ore can be profitably treated, and the expert who has had charge of these tests recently left for London to submit the results of his findings to the directors of the company.
graphic for visual presentation of text It is estimated that there are 750,000 tons of ore in the dumps, and if, as stated, this can be treated at a profit of about $3.50 per ton, it will mean a profit of $2,625,000 to the company.
graphic for visual presentation of text If the plans are carried out, it will probably mean the erection of a mill capable of treating 1,000 tons of ore daily.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 02.10.2022 (08:15:59)
Above Info was First Seen 01.04.2011