Detailed/More Info:
Sangre de Cristo Tunnel
This is a hidden text,
acting just like a spacer
type of text in order to
push the Entity info
down on the page. Sorry to have wasted your time/ear to listen to this, I was just trying to get a layout work like I wanted.
Info Database Last Updated 08.04.2024 (Entity News entries: 3)
Type/Category of Info:
General Mining News
Info Source From:
The Mining and Scientific Press. Volume: 123 [CXXIII], Issue No. 9
Info Publication Date:
August 27, 1921
Info found on page:
304
Info Title:
Sangre de Cristo Tunnel is Extending
Sam MacDonald, pioneer mining man and former superintendent of the El Paso Gold King, is extending the Sangre de Cristo tunnel into Tenderfoot hill. He is saving medium-grade ore.
graphic for visual presentation of text The tunnel heading is in Black Diamond territory, a former producer controlled by the Lennox-Giddings interests.
Above Info was Last Updated on 30.10.2020 (11:04:30)
Above Info was First Seen 16.02.2020

Type/Category of Info:
General Mining News
Info Source From:
The Mining and Scientific Press. Volume: 124 [CXXIV], Issue No. 5
Info Publication Date:
February 4, 1922
Info found on page:
170
Info Title:
Sangre de Cristo Tunnel in Promising Vein
A promising ore-shoot has been opened on the south-western slope of Tenderfoot hill by the Heaton Leasing Co., operating in the Sangre de Cristo tunnel. The vein, new to the property, has been opened by drift for about 25 to 30 ft., between two and three feet of ore sampling two to five ounces gold per ton.
graphic for visual presentation of text The vein was cut while extending the tunnel to cut the Black Diamond vein, that has been producing high-grade ore from shallow workings.
Above Info was Last Updated on 30.10.2020 (11:04:30)
Above Info was First Seen 10.02.2020

Type/Category of Info:
General Mining News
Info Source From:
The Mining and Scientific Press. Volume: 124 [CXXIV], Issue No. 9
Info Publication Date:
March 4, 1922
Info found on page:
311
Info Title:
Sangre de Cristo Tunnel Soon to Ship
Ore assaying as high as 25 oz. has been opened on Tenderfoot hill, in the Sangre de Cristo tunnel, and a shipment now being made ready is estimated at better than two ounces gold per ton.
graphic for visual presentation of text The property is under lease to the Heaton Leasing Co. of Denver.
Above Info was Last Updated on 30.10.2020 (11:04:30)
Above Info was First Seen 12.02.2020